Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapid Rail Transit》 2006-04
Add to Favorite Get Latest Update

Management Mode of the Multi-line Integrated Debugging Drill in Guangzhou Metro

Lin Wangxian(Guangzhou Metro Corporation,Guangzhou 510030)  
Based on the integrated debugging drill management experiences of Guangzhou metro for the modified project of line 2, the first operating section of line 3 and the university-town section of line 4, the paper analyzes and discusses the management mode of the multi-line integrated debugging drill in urban rail transit, and demonstrates that the application of project integrated management is effective in large-scale integrated debugging drill of urban rail transit.
【CateGory Index】: U231.92
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Zhou Maoqing(Chengdu Metro Corporation,Chengdu 610031);Discussion on Metro System Debugging and Operation Drilling[J];Urban Rapid Rail Transit;2010-02
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Guo Chunan (Urban Plan and Design Institute of Beijing, Beijing 100045);Revised Plan for Beijing Urban Rail Transit Network[J];Urban Rapin Rail Transit;2004-01
2 Chen Guang(Nanjing Metro Construction Headquarters, Nanjing 210024);Life - cycle Integrated Management of Urban Rail Transit Project[J];Urban Rapin Rail Transit;2005-01
3 Le Mei Wang Ling(Chongqing Rail Transit Corporation, Chongqing 400015);On Simulated Rehearsal in Case of Emergency in Light-Rail Operation[J];Urban Rapin Rail Transit;2005-03
4 Li Haichuan (China Academy of Railway Science (Beijing) Engineering Consulting Co., Ltd., Beijing 100044);A Discussion on the Integrated System Test and Operation Drilling of Urban Rail Transit[J];Urban Rapin Rail Transit;2005-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG De.GAN Di,ZHU Chasong.LU Ximing;A Research on the Relationships between Suburban Spatial Planning and Railway Traffic Planning in Shanghai[J];Urban Planning Forum;2012-01
2 Shi Zhongheng;Planning for the Construction of Urban Rail Transit[J];Urban Rapin Rail Transit;2004-02
3 0heng Xiaowei;Zhan Minghui China Metro Engineering Consulting Corporation, Beijing 100037 Beijing Metro Operation Corporation Ltd, Beijing 100044;Comparison of Metro Planning and Construction between Russia and China[J];Urban Rapin Rail Transit;2004-02
4 Hu Xiaofei Wei Qingchao(School of Civil and Architecture Engineering, Beijing Jiaotong University, Beijing 100044);Role of Rail Transit in and Countermeasures for Restructuring of Beijing City[J];Urban Rapin Rail Transit;2004-S1
5 Pang Yucheng1 Zhang Yong2 (1. Binzhou Medical College, Binzhou, Shandong 256613;2. Company of Doctor Management & Consulting,Tianjin 300071);Information Integration Management in Urban Rail Transit Projects[J];Urban Rapid Rail Transit;2007-05
6 Xu Shuliang(Branch Company of Operation,Nanjing Metro Corporation,Nanjing 210012);Establishment of Emergency Tackling Mechanism on Nanjing Subway[J];Urban Rapid Rail Transit;2008-03
7 Zhou Maoqing(Chengdu Metro Corporation,Chengdu 610031);Discussion on Metro System Debugging and Operation Drilling[J];Urban Rapid Rail Transit;2010-02
8 Guan Bo Liu Changping(Chongqing Urban Rail Transit Group Co.,Ltd.,Chongqing 400042);Equipment Optimal Management in Chongqing Rail Transit[J];Urban Rapid Rail Transit;2010-05
9 Chen GuangConsoructinal Headquarters of Nanjing Metro Engineering,210008,Nanjing,China;Research on Integrated Cost Management of URT Project Life-cycle[J];Urban Mass Transit;2005-06
10 Lin Wangxian,Yu Junyan Guangzhou Metro Corporation,510230,Guangzhou,China;Application of Project Management on Consultations for Preparatory Operation of Xi'an City Metro[J];Urban Mass Transit;2008-07
【Co-references】
Chinese Journal Full-text Database 2 Hits
1 Wu Juan Xu Ling Du Haifang (Operation Branch Company of Nanjing Metro Co., Ltd., Nanjing 210012);Schedule Control in System Integrated Test in the First Stage of Construction of Nanjing Metro Line 1[J];Urban Rapin Rail Transit;2005-04
2 Li Haichuan (China Academy of Railway Science (Beijing) Engineering Consulting Co., Ltd., Beijing 100044);A Discussion on the Integrated System Test and Operation Drilling of Urban Rail Transit[J];Urban Rapin Rail Transit;2005-04
【Secondary References】
Chinese Journal Full-text Database 4 Hits
1 Hou Jiuwang(Xi'an Metro Co.,Ltd.,Xi'an 710018);Study on External Attributes of Mechanical and Electrical Equipment Adopted in Urban Rail Transit Construction[J];Urban Rapid Rail Transit;2010-05
2 Shen Weiping(Chengdu Metro Corporation,Chengdu 610031);Planning and Implementation of Integrated Equipment Test on Chengdu Metro Line 2[J];Urban Rapid Rail Transit;2013-02
3 Wang Keming;Xue Weiqing;Xu Peng;Dept. of Computer and Communication,Emei Campus of Southwest Jiaotong University;;Current Situation of High-speed Railway Joint Debugging and Commission in China[J];Urban Mass Transit;2013-10
4 Hu Zesheng;;Practice and Innovation in Operational Exercises on Xi'an Metro Line 1[J];Modern Urban Transit;2014-02
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 Zhao Chengguang (College of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044);The Framework Research on the ITS of Urban Rail Transit[J];Urban Rapin Rail Transit;2004-06
2 HE Qing hua, CHEN Fa biao (Research Institute of Project Administration and Management, Tongji University, Shanghai 200092, China);A Research of Life Cycle Integrated Management Pattern of Construction Project[J];Journal of Chongqing Jianzhu University;2001-04
3 He Qinghua, ChengFabiao ,LU Yong (Research Institute of Project Administration and Management,Tongji University, Shang hai 200437);The concept and organization of life cycle integrated managenent pattern of construction project[J];Optimization of Capital Construction;2001-02
4 ZHAO Likun,CHEN Liwen,SU Chunsheng(School of Management, Hebei University of Technology, Tianjin ,300130);Study on The Synthetic Integrating Model of The Construction Project Administrative Structure[J];Optimization of Capital Construction;2003-05
5 Jia Guangshe Wang Guangbin (School of Economics and Management, Tongji University);STUDY ON PROJECT CONTROLLING MODEL FOR THE LARGE AEC PROJECT IN CHINA[J];China Civil Engineering Journal;2003-03
Similar Journals
> Urban Rapid Rail Transit
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved