Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapid Rail Transit》 2006-04
Add to Favorite Get Latest Update

On Reducing the Gap between the Train and the Platform Edge

Wu Yongfang (Shenzhen Metro Corporation, Shenzhen 518040)  
The neccesity and feasibility of reducing the gap between the carriage and the platform edge is put forward by analysing the current gap and the clearancegauge of vehicles as well as the recognition of national standards. Utilizing the trains supplied by Bombardier Co. in Shenzhen metro,gauging analysis have been carried out by means of vehicle dynamic simulation. Results of the dynamic vehicle profiles are tentatively adopted to reduce the current gaps. The ideal platform gap can only satisfy the practical vehicle profile, and the safety gap for train motion should be filled with a flexible sawtoothed rubber filler to guarantee simultaneously the safety of operation and the safety of passengers boarding and alighting the train.
【CateGory Index】: U270.11
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 CHEN Zhong-jie(CSR Zhuzhou Electric Locomotive Co.,Ltd.,Zhuzhou 412001,China);Disscussion on metro gauge[J];Electric Locomotives & Mass Transit Vehicles;2007-06
2 XIA Jinghui1,2,LIANG Qinghuai1(1.School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;2.Zhengzhou City Rail Transit Co.,LTD,Zhengzhou 450046,China);Study on Platform Construction Clearance of Linear Metro[J];Journal of Beijing Jiaotong University;2010-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 CHEN Xi-hong(Zhuzhou Electric Locomotive Works,Zhuzhou412001,China);Development trend of metro vehicle technologies at home and aboard[J];;2002-06
2 LIU You-mei,YANG Ying (Zhuzhou Electric Locomotive Works,Zhuzhou412001,China);Linear motor driving metro vehicle—a new mode for urban mass transit[J];Electric Locomotives & Mass Transit Vehicles;2003-04
3 Liang Qinghuai Kong Lingyang (Beijing Jiaotong University, Beijing 100044);Gauges of Linear Motor Rail Transit System[J];Urban Rapid Rail Transit;2006-02
4 Ni Chang Wang Jian(The Second Survey and Design Institute, C.R.E.C., Chengdu 610031);On the Platform Construction Clearance[J];Urban Rapid Rail Transit;2006-06
5 Ni Chang(China Railway 2~(nd) Survey and Design Institute Engineering Group Co.,Ltd.,Chengdu 610031);Classification and Application of the Traffic Clearance of Urban Rail Transit[J];Urban Rapid Rail Transit;2008-02
6 Ouyang Quanyu, Wang Zhipei, Jiang Chuanzhi Tianjin Municipal Engineering Design & Research Institute,300051,Tianjin, China;On Architectural Gauge Calculation of Subway's Curve Platform[J];Urban Mass Transit;2007-05
7 ZHANG Li ping,LI Fu,HUANG Yun hua (Traction Power Research Center, Southwest Jiaotong University, Chengdu 610031, China);General of Development and Application of Urban Light Rail Abroad[J];Foregin Roling Stock;2001-03
8 WU Liben (Sifang Rolling Stock Research Institute, Qingdao 266031, China);Development General of Urban Light Rail Traffic and Vehicles Abroad[J];Foreign Rolling Stock;2003-04
9 Thomas Siegemund Wang Lihu(Adtranz Co. , Gemany) (Shanghai Metro Corporation, Shanghai 200031);Rolling Stock in Shanghai Metro[J];Urban Mass Transit;1998-04
10 LONG Xuyou1,2,WEI Qingchao1,WANG Yingjie1,SHI Jin1(1.School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China;2.The 3rd Railway Survey and Architecture Institute,Tianjin 300142,China);Study on Curve Radius Standard for Linear Metro[J];Journal of Beijing Jiaotong University;2009-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved