Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Rapid Rail Transit》 2006-04
Add to Favorite Get Latest Update

Problems Encountered in the Operation of Rigid Conductor System and Solutions

Luo Zhiyong(Guangzhou Metro Corporation, Guangzhou 510030)  
The development and application of the techniques of rigid conductor system in China are still in the primary stage and there is no experience can be used for reference. The paper summarizes the problems encountered in the operation of Guangzhou metro, the first metro system adopting this technology in China, in respect of the rigid conductor system and puts forward some solutions.
【CateGory Index】: U225
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Yu Zhan(Guangzhou Metro Corporation,Guangzhou 510030);Analysis on the Abrasion of Rigid Catenary System[J];Urban Rapid Rail Transit;2009-05
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Lai Shenggang Guangzhou Metro Corporation, Guangzhou 510030;Frequently Met Questions and Treatment Methods for the Rigid Overhead Catenary System in Metro Operation[J];Urban Rapin Rail Transit;2004-02
2 Zhu Feixiong China Railway Electrification Bureau Group,Beijing 100036;The interoperability of the trans-European railway OCL-Pantograph system and its impacts[J];Railway Standard Design;2005-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Fang,WANG Li,GAO Xiao-rong,WANG Ze-yong,ZHAO Quan-ke(Photoelectric Engineering Institute,Southwest Jiaotong University,Chengdu 610031);Study of measuring the contact force between pantograph and catenary[J];Electric Locomotives & Mass Transit Vehicles;2006-06
2 ;一种新型接触网检测车杆位自动识别校正系统[J];Electric Railway;2004-06
3 ;接触网动态检测与电磁兼容[J];Electric Railway;2005-01
4 YUAN Yusen;At-a-time Construction Technology for Stringing OCS Messenger Wire[J];Electric Railway;2005-03
5 Ao Xiaofeng, Liu Shibing;Train Carried Automatic Conversion System for Passing Through The OCS Phase Break[J];Electric Railway;2006-02
6 Guo Fengping, Chen Tanglong, Niu Dapeng etc.;OCS Stagger Selection in Curve Section[J];Electric Railway;2006-05
7 Zhao Zhenglu;Discussion on Improvement of Relation Between Pantograph and Contact Wire at Rigid-Flexible Traction Areas[J];Electric Railway;2006-06
8 Tan Donghua;Analysis and Counter Measures of Abnormal Wear between Catenary and Pantograph under Rigid Suspension of OCS[J];Electric Railway;2007-01
9 Zhang Yue, Wu Jiqin, Xu Kejia;Detection System of Dynamic Envelope Line of Pantograph based on Machine Vision[J];Electric Railway;2007-06
10 Fu Junwu;Differences in Functions of Flexible and Rigid Suspension OCS and Their Parameters[J];Electric Railway;2007-06
China Proceedings of conference Full-text Database 2 Hits
1 ;车载非接触式接触网在线检测系统的应用研究[A];[C];2006
2 HUANG He~1 ZHAO Xue~2 (1.Electrified Company,China Railway 8th Group Co.Ltd of CREC,Chengdu,Sichuan 610081,China;2.China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China);The Scheme and Construction for Low Headroom Contact Suspension of Sui-Yu Railway Line Ballastless Track Experimental Section[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Chang Shinan Han Fenghua (Beijing University of Aeronautics and Astronautics,Dept. of Flight Vehicle Design and Applied Mechanics);Performance Analysis on Hot Air Anti Icer of Airplane Engine Inlet[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1999-02
2 MIAO Gang,ZHANG Bin hua,WANG Jin song (The 49th Research Institute of the Electronics,Ministry of Information Industry,Harbin 150001,China);Intelligent application of the single chip processor in ice sensor[J];Journal of Transducer Technology;2002-02
3 Du Yongguo Yang Guang Zhang Jiachun Long Yan Wang Guanghua (National University of Defense Technology);Analysis on Physical Metallurgy Process of AgMeO Contact Materials During the Arc Electrode Interaction[J];TRANSACTIONS OF CHINA ELECTROTECHNICAL SOCIETY;1998-04
4 LU Jin-hua (Guangzhou Metro Corporation, Guangzhou 510380, China);Analysis on the wearing of Guangzhou Metro Line 1 vehicles[J];Technology For Electric Locomotives;2001-03
5 ;气候对胶济线电气化铁道接触网的影响分析[J];Electric Railway;2004-06
6 LI Jian;Improvement of Relationship Between Pantograph and OCS by Selection of OCS Stagger Setting[J];Electric Railway;2005-06
7 WANG Guoliang CHEN Tanglong LI Hongsheng;Analysis of Static Force & Dynamic Force for OCS Rigid Suspension[J];Electric Railway;2005-06
8 Yang Mingming,Ding Weimin;Cu-Sn Contact Wire and Its Application Prospect[J];Electric Railway;2006-03
9 Tan Donghua;Analysis and Counter Measures of Abnormal Wear between Catenary and Pantograph under Rigid Suspension of OCS[J];Electric Railway;2007-01
10 Liu Mingguang,Lu Yan’an,Wei Hongwei etc.;Study on Articulated Neutral Section Over-voltage Test[J];Electric Railway;2007-04
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 Yu Zhan(Guangzhou Metro Corporation,Guangzhou 510030);Treatment of Tripping Faults for DC 1500 V Circuit Breakers in Metro[J];Urban Rapid Rail Transit;2010-02
2 HONG Cong-lu, HE ZHong-tao School of Electrical mechanical, Lanzhou Jiaotong University, Lanzhou, Gansu 730070, China;Research of De-icing Unit and Installation for Catenary[J];China Science and Technology Information;2010-19
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved