Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Power System Technology》 2013-01
Add to Favorite Get Latest Update

Research on Multi-Objective Scheduling for Low-Carbon Power System With Wind Farms

ZHANG Xiaohui1,DONG Xinghua2(1.Key Lab of Power Electronics for Energy Conservation and Motor Drive of Hebei Province(Yanshan University),Qinhuangdao 066004,Hebei Province,China;2.Chengde Power Supply Company,Chengde 067000,Hebei Province,China)  
There are two objective functions in the proposed multi-objective economic dispatching model for low-carbon power system containing wind farms:generation cost and carbon emission.Considering economy of power system the carbon emission should be reduced;considering the risk brought by wind farms,the risk cost should be added in the generation cost;to achieve the energy-saving and carbon emission reduction,the output of wind farms should be increased while the economy of power system is ensured.The proposed multi-objective economic dispatching model for low-carbon power system containing wind farms is solved by improved multi-objective particle swarm optimization algorithm.Simulation results of IEEE 13-machine system show that the proposed multi-objective economic dispatching model is correct and effective.
【CateGory Index】: TM734
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 ZHANG Xiaohui;YAN Keke;LU Zhigang;HE Shoulong;Key Lab of Power Electronics for Energy Conservation and Motor Drive of Hebei Province(Yanshan University);;Carbon Trading Based Low-Carbon Economic Dispatching for Power Grid Integrated With Wind Power System[J];Power System Technology;2013-10
2 XU Dan;ZHAO Hong-tu;DING Qiang;ZHANG Xiao-tian;CAI Zhi;China Electric Power Research Institute;College of Computer Science and Technology,Henan Polytechnic University;Northeast Power Dispatching Center;;Modeling strategy based on utility of security constrained economic dispatch[J];Power System Protection and Control;2013-24
3 LU Jie;PENG Chun-hua;School of Electrical Engineering,East China Jiaotong University;;Multi-objective Generation Dispatch with Wind Power Access System Considering Environmental Benefits[J];Shaanxi Electric Power;2013-06
China Proceedings of conference Full-text Database 1 Hits
1 Xie Lirong1,2,Guo Feng3,Ding Qia1,2,Huang Jing3,Zhang Jun3 Nari Technology Development Limited Company,Nanjing 210061,China 2.State Grid Electric Power Research Institute,Nanjing,210008,China 3.State Grid Zhejiang Electric Power company,Hangzhou 310007,China);Day-ahead Generation Schedule in Equilibrium Power Generation Dispatching Mode Considering Low-carbon[A];[C];2013
【Citations】
Chinese Journal Full-text Database 10 Hits
1 JIANG Yue-wen,CHEN Chong,WEN Bu-ying(College of Electrical Engineering and Automation of Fuzhou University,Fuzhou 350002,China);Economic dispatch based on particle swarm optimization of stochastic simulation in wind power integrated system[J];Advanced Technology of Electrical Engineering and Energy;2007-03
2 Jiang Yuewen Chen Chong Wen Buying (Fuzhou University Fuzhou 350002 China);Particle Swarm Research of Stochastic Simulation for Unit Commitmen in Wind Farms Integrated Power System[J];Transactions of China Electrotechnical Society;2009-06
3 CHEN Hai-yan, CHEN Jin-fu, DUAN Xian-zhong Huazhong University of Science and Technology, Wuhan 430074, China;Fuzzy Modeling and Optimization Algorithm on Dynamic Economic Dispatch in Wind Power Integrated System[J];Automation of Electric Power Systems;2006-02
4 WU Chang-you1,WANG Fu-lin1,DONG Zhi-gui2,SUO Rui-xia1 (1. College of Engineering,Northeast Agricultural University,Harbin 150030,Heilongjiang Province,China; 2. Shenyang Orient Titanium Industry Co.,Ltd.,Shenyang 110016,Liaoning Province,China);Application of Improved Particle Swarm Optimization in Power Load Combination Forecasting Model[J];Power System Technology;2009-02
5 ZHAO Shan-shan,ZHOU Zi-guan,ZHANG Dong-xia,YIN Yong-hua (China Electric Power Research Institute,Haidian District,Beijing 100192,China);Risk Assessment Index of Dynamic Stability for Large-Scale Interconnected Grids and Its Application[J];Power System Technology;2009-02
6 SU Peng,LIU Tian-qi,ZHAO Guo-bo,ZHANG Jiong (School of Electrical Engineering and Information,Sichuan University,Chengdu 610065,Sichuan Province,China);An Improved Particle Swarm Optimization Based Multi-Objective Load Dispatch Under Energy Conservation Dispatching[J];Power System Technology;2009-05
7 LUO Hai-yang,LIU Tian-qi,LI Xing-yuan (School of Electrical Engineering and Information,Sichuan University,Chengdu 610065,Sichuan Province,China);Chaotic Forecasting Method of Short-Term Wind Speed in Wind Farm[J];Power System Technology;2009-09
8 ZHANG Ning1,ZHOU Tian-rui1,DUAN Chang-gang2,TANG Xiao-jun2,HUANG Jian-jun2,LU Zhan2,KANG Chong-qing1(1.State Key Lab of Control and Simulation of Power Systems and Generation Equipment(Dept.of Electrical Engineering,Tsinghua University),Haidian District,Beijing 100084,China;2.Gansu Provincial Electricity Trading Center,Lanzhou 733050,Gansu Province,China);Impact of Large-Scale Wind Farm Connecting With Power Grid on Peak Load Regulation Demand[J];Power System Technology;2010-01
9 XU Wei1,YANG Yu-lin2,LI Zheng-guang2,HU Dian-gang2,XIA Tian2,KANG Chong-qing1 (1.State Key Lab of Control and Simulation of Power Systems and Generation Equipments (Dept.of Electrical Engineering,Tsinghua University),Haidian District,Beijing 100084,China;2.Gansu Electric Power Corporation,Lanzhou 730050,Gansu Province,China);Participation Mode of Large-Scale Jiuquan Wind Power Farm in Gansu Province to Electricity Market and Its Utilization Scheme[J];Power System Technology;2010-06
10 SU Peng,LIU Tianqi,LI Xingyuan(School of Electric Engineering and Information,Sichuan University,Chengdu 610065,Sichuan Province,China);Determination of Optimal Spinning Reserve of Power Grid Containing Wind[J];Power System Technology;2010-12
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 JIA De-xiang1,HAN Jing2(1.State Power Economic Research Institute,Beijing 100761;2.Maanshan Power Supply Company,Maanshan 243000,China);Volt/var Control in Distribution Systems Based on Modified Particle Swarm Optimization[J];Journal of Anhui Electrical Engineering Professional Technique College;2009-01
2 CHEN Xing-ying,ZHANG Xiao-hua,QU Feng,LIU Hao-ming,ZHAO Bo(College of Electrical Engineering,Hohai University,Nanjing 210098,Jiangsu Province,China);Survey on applications of data mining in power system[J];Journal of Electric Power Science and Technology;2007-03
3 ZHONG Jia-qing, LU Zhi-gang(Key Laboratory of Power Electronics for Energy Conservation and Motor Drive of Hebei Province, Yanshan University,Qinhuangdao, Hebei 066004, China);Research on environmental economic dispatch of power system including wind farm[J];Journal of Yanshan University;2011-03
4 JIANG Yue-wen,CHEN Chong,WEN Bu-ying(College of Electrical Engineering and Automation of Fuzhou University,Fuzhou 350002,China);Economic dispatch based on particle swarm optimization of stochastic simulation in wind power integrated system[J];Advanced Technology of Electrical Engineering and Energy;2007-03
5 Jiang Yuewen Chen Chong Wen Buying (Fuzhou University Fuzhou 350002 China);Particle Swarm Research of Stochastic Simulation for Unit Commitmen in Wind Farms Integrated Power System[J];Transactions of China Electrotechnical Society;2009-06
6 Hong Lucheng1 Shi Libao1 Yao Liangzhong2 Masoud Bazargan2 Ni Yixin1 (1. Graduate School at Shenzhen,National Key Laboratory of Power Systems in Shenzhen Tsinghua University Shenzhen 518055 China 2. AREVA T&D Technology Centre Stafford ST17 4LX UK);Fuzzy Modelling and Solution of Load Flow Incorporating Uncertainties of Wind Farm Generation[J];Transactions of China Electrotechnical Society;2010-08
7 Su Haifeng1,2 Zhang Jianhua2 Liang Zhirui1 Zhang Shuo1 Niu Shengsuo1(1.State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University Baoding 071003 China 2.State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University Beijing 102206 China);Substation LCC Planning Based on Refined Mean Clustering Random Particle Swarm Algorithm[J];Transactions of China Electrotechnical Society;2012-04
8 Tan Zhongfu Dong Litong Liu Wenyan Yu Chao Song Yihang(North China Electric Power University Beijing 102206 China);A Cooperation Game Optimization Model for Energy Generating Interchange between Power Generation Units with Environmental Emission Constraints[J];Transactions of China Electrotechnical Society;2012-05
9 Han XuShan 1 and Chen Fei 2 1. Gansu Electric Power Corporation; 2. Lanzhou Power Supply Company Guijunfeng;Research on Wind Farm Participation in Power Grid AGC Control[J];电气(英文版);2011-03
10 XIE Guohui1,LI Qionghui1,GAO Changzheng2,WU Yongmei1(1.State Grid Energy Research Institute,Beijing 100052,China;2.Jilin Electric Power Research Institute,Changchun 130021,China);Research on Wind Power Accommodation Based on Balmorel Model[J];Energy Technology and Economics;2011-05
China Proceedings of conference Full-text Database 8 Hits
1 Ning Chen~1,Yun Zhang~(2*) 1.School of Mechanical and Automotive Engineering,Zhejiang University of Science and Technology,Hangzhou,310023,China 2.School of Information Science and Technology,Zhejiang Forestry University,Hangzhou,311300;Calculation Method of Active Power Output of Wind Farms Connected to Grids Based on FRC[A];[C];2010
2 SUN Hui-juan1,PENG Chun-hua1,YI Hong-jing2(1.School of Electrical and Electrnonic Engineering,East of China JiaoTong University,NanChang,330013,China;2.Jiangxi CPI New Energy Generating Co.,Ltd,NanChang,330038,China);Studies on Multi-objective Stochastic Optimal Dispatch for Power Systems with Wind Farms[A];[C];2012
3 LIU Mingfeng~(1,2),XIU Chunbo~(1,2) (1.Key Laboratory of Advanced Electrical Engineering and Energy Technology, Tianjin Polytechnic University,Tianjin 300387,China; 2.School of Electrical Engineering and Automation,Tianjin Polytechnic University,Tianjin 300387,China);Hybrid prediction method for wind speed series based on ARMA and neural network[A];[C];2013
4 CHANG Haijun1,REN Xiancheng1,LI Yong2,LIU Fusuo1,XU Youping2,LI Wei1,DANG Jie2(1.Nanjing NARI Group Co.,ltd./State Grid Electric Power Research Institute,Nanjing,Jiangsu Province 210003;2.Central China Power System Dispatching & Control Branch Center,Wu Han Hubei Province 430077);Research on the Assessment & Blocking of Transient Successive Instability Based on the Risk[A];[C];2013
5 LI Jiang1,2,DAI Sai1,HU Chen-xu1,LI Lin-guang2,LIU Li-qiang2,QI Da-wei2 1.China Electric Power Research Institute,Beijing 100192,China;2.Beijing Jiaotong University,Beijing 100044,China);A Method For Dealing With Large-Scale Wind Farms Affect Real-Time Optimization Of Power System Dispatching[A];[C];2013
6 Wang Danping(NARI Technology Co.Ltd.,Nanjing 210061,China);Spinning Reserve Model in Power System Integrated Power System taking EENS[A];[C];2013
7 Tu Mengfu[1],Chen Zhixu[2],Wang Chuanfeng[3],Ding Qia[1](1.NARI Technology Development Co.Ltd.,Nangjing,210061,China;2.North China Branch of State Grid Corporation of China,Beijing 100053;3.Linqing Power Supply Corporation,Linqing,252600);A Analysis Method for Optimization of Large Scale Wind Power Integration and Its Application[A];[C];2013
8 Zhang Hao~1,Kang Fengqin~2,Liu Haoming~2,Yong Taiyou~3 (1.State Grid Huzhou Electric Power Company,Huzhou 313000,China; 2.College of Energy and Electrical Engineering,Hohai University,Nanjing 210098,China; 3.Eversource Consulting,Inc.,California,95608,USA);Grid Operation and Maintenance Risk Assessment Based on Fuzzy Analytic Hierarchy Process[A];[C];2013
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Kang Le and Li Xing liang Beijing Tianrun New Energy Co.,LTD.;The complementation of large hybrid solar wind power station located in shi san jian pang ,hami xinjiang[J];Solar & Renewable Energy Sources;2010-04
2 Chen Ya' ai Zhang Weiping Liu Yuanchao Cheng Qiang(College of Electromechanical Eng., North Chian Univ. of Tech., 100041, Beijing, China);Establishment of Complementary Experimental Power Supply System with Wind and Photovoltaic Powers[J];Journal of North China University of Technology;2004-03
3 LI Yu-dun,XIE Kai-gui(State Key Laboratory of Power Transmission Equipment & System Security and New Technology,Chongqing 400044,China);Reliability assessment of power systems containing multiple wind farms[J];Journal of Electric Power Science and Technology;2011-01
4 Xie Xiaorong Cui Wenjin Tang Yiliang Han Yingduo (Qinghua University 100084 China);Coordinated Designing of Decentralized STATCOM Controller and PID-type Generator AVR[J];Transactions of China Electrotechnical Society;2001-03
5 Jiang Yuewen Chen Chong Wen Buying (Fuzhou University Fuzhou 350002 China);Particle Swarm Research of Stochastic Simulation for Unit Commitmen in Wind Farms Integrated Power System[J];Transactions of China Electrotechnical Society;2009-06
6 Ge Liang1 Xie Yuxiang1 Li Xiangqi2 Chen Qingqi2 Yao Jiangang1 (1. Hunan University Changsha 410082 China 2. Hunan Electric Power Co. Changsha 410007 China);The Method About Energy Saving and Emission Reduction of Power Generation Transaction Dispatch Conformed to Market Mechanism[J];Transactions of China Electrotechnical Society;2009-08
7 Yu Jie Huang Xueliang Xia Anbang(Southeast University Nanjing 210096 China);Environmental Economic Dispatch Based on Sub-Area Coordinated Optimization[J];Transactions of China Electrotechnical Society;2010-01
8 Zheng Xiao1 Zhang Jing2 Ma Taotao1 Zhu Shaohua1 Huang Bin3 Guo Chuangxin1 (1. Zhejiang University Hangzhou 310027 China 2. Patent Agency of Jiangxi Province Nanchang 330046 China 3. Zhejiang Electricity Power Corporation Hangzhou 310007 China);Power System Multi-Objective Optimization Dispatch Based on an Improved Decision-Making Method[J];Transactions of China Electrotechnical Society;2010-09
9 Song Honglei Wu Junyong Ji Luyu Gao Lizhi Liu Yinlei Huang Pengzhou (Beijing Jiao Tong University Beijing 100044 China);Multi-Objective Optimal Sizing of Stand-Alone Hybrid Wind/PV System[J];Transactions of China Electrotechnical Society;2011-07
10 Yan Wei; Zhu Jizhong; Sun Hongbo; Xu Guoyu(Chongqing University. 400044. Chongqing. China);STUDY ON MODEL AND CONTROLLER OF UPFC[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-06
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Li-jie1,LIAO Xiao-zhong1,2,GAO Shuang1,DONG Lei1,2(1.Department of Automatic Control,School of Information Science and Technology,Beijing Institute of Technology,Beijing 100081,China;2.Key Laboratory of Complex System Intelligent Control and Decision of Ministry of Education,Beijing 100081,China);Chaos Characteristics Analysis of Wind Power Generation Time Series for a Grid Connecting Wind Farm[J];Transactions of Beijing Institute of Technology;2007-12
2 CAI Jin-ding,FU Zhong-yun(Electrical Engineering and Automation College of Fuzhou University,Fuzhou 350002,China);Application of particle-group and neural network hybrid algorithm in fault diagnosis of three-phase rectification circuit[J];Advanced Technology of Electrical Engineering and Energy;2006-04
3 GUO Yuan-fan,YANG Feng,DONG Zhao-xia(College of Hydropower and Information Engineering in Huazhong University of Science and Technology,Wuhan 430074,China);Available transfer capability calculation using particle swarm optimization algorithm[J];Advanced Technology of Electrical Engineering and Energy;2006-04
4 JIANG Yue-wen,CHEN Chong,WEN Bu-ying(College of Electrical Engineering and Automation of Fuzhou University,Fuzhou 350002,China);Economic dispatch based on particle swarm optimization of stochastic simulation in wind power integrated system[J];Advanced Technology of Electrical Engineering and Energy;2007-03
5 Jiang Yuewen Chen Chong Wen Buying (Fuzhou University Fuzhou 350002 China);Particle Swarm Research of Stochastic Simulation for Unit Commitmen in Wind Farms Integrated Power System[J];Transactions of China Electrotechnical Society;2009-06
6 YANG Wei-hong, SHAN Bao-guo, GUO Li-jie (State Power Economic Research Institute, Beijing 100761, China);Analysis on Influence of Closing Down Small Thermal Power Generating Units on the Power Network of the 11~(th) Five-Year Plan[J];Electric Power Technologic Economics;2007-04
7 YAO Peng,YUAN Xiao-tao(College of Electrical and Information Engineering,Hunan University,Changsha 410082,China);Research on Decision Support System Algorithm in Real-time Economic Dispatch[J];Electric Power Science and Engineering;2007-03
8 Zhang Guoquan,Wang Xiuli,Wang Xifan Xi'an Jiaotong U niversity,Xi'an71 0 0 4 9,China;STUDY ON BENEFITSAND COSTSOF SPINNING RESERVE CAPACITY IN POWER MARKET[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-21
9 Han Xueshan 1, Liu Zhuo 2 (1. Shandong University, Jinan 250062, China) (2. Harbin Institute of Technology, Harbin 150001,China);DECOUPLED ECONOMIC DISPATCH INCLUDING UNIT RAMP RATE AND NETWORK SECURITY CONSTRAINTS[J];Automation of Electric Power Systems;2002-13
10 Yang Hongming 1, Duan Xianzhong 2 (1. Changsha University of Electric Power, Changsha 410077, China) (2. Huazhong University of Science and Technology, Wuhan 430074, China);BILATERAL TRANSACTION CURTAILMENT MODEL BASED ON FUZZY THEORY[J];Automation of Electric Power Systems;2002-20
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved