Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Geospatial Information》 2007-02
Add to Favorite Get Latest Update

Establishment of Engineering Control Network with High Accuracy

LIU Renzhao1;LIU Tingming2 (1.Department of Surveying and Geoinformatics,Tongji University,Shanghai 200092,China; 2.Shanghai Jianhao Engineering Counseling Company Limited,Shanghai 200030,China)  
The method of engineering control network with high accuracy about its design, field surveying and data processing are detailed in this paper, and also is verified by the engineering example of Shanghai synchrotron radiation facility. It may be helpful to the same kind of project.
【CateGory Index】: P258
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 7 Hits
1 XIAO Hai-hong;WANG Cheng-long;HAN Fei;Henan Institute of Engineering;Chinese Academy of Surveying and Mapping;Beijing Geo-Vision Tech.Co.,Ltd.;Centre for Geodetic Data Processing,National Administration of Surveying,Mapping and Geoinformation;;Discussion on key technology of large visual field array CCD digital aerial camera calibration[J];测绘科学;2015-09
2 LIU bin;LV Hong-quan;;The establish of GPS control network and the estimate oftransfixion error for the Tianping tunnel railway project[J];铁道勘察;2014-05
3 GU Yunxiang;;Surveying Control on the Big Long Deep Tunnel[J];测绘通报;2014-06
4 LIU Fan-zhen,MA Qing-tao Team 607,Bureau of Non-ferrous Metals Geological Exploration of Jilin Province,Jilin 131205,Jilin,China;Discussion of control measurement of geological engineering[J];吉林地质;2013-01
5 LI Shiping 1,2 , WU Wenbo 1 (1. School of Geomatics, Liaoning Technical University, Fuxin 123000, China; 2. School of Coal Science and Engineering, Inner Mongolia University of Science & Technology, Baotou 014014, China);Application of GPS in establishing control network of high-speed railway[J];辽宁工程技术大学学报(自然科学版);2012-05
6 LIN Jiarui ZHU Jigui GUO Yin GUO Tinghang YE Shenghua(State Key Laboratory of Precision Measuring Technology and Instruments,Tianjin 300072);Establishment of Precise Three-dimensional Coordinate Control Network in Field Large-space Measurement[J];机械工程学报;2012-04
7 Yang Tie-li①②③,LIU Xian-lin②③,SU Qiu-peng④(①School of Resource and Civil Engineering,Liaoning University of Science and Technology Liaoning 114051,China;②Chinese Academy of Surveying and Mapping,Beijing 100039,China;③Capital Normal University,Beijing 100037,China;④Beijing Daqianmen Investment Management Co.Ltd,Beijing 100051,China);Setting of automatic calibration landmark in an aerial integrated multi-functional field[J];测绘科学;2010-06
【Citations】
Chinese Journal Full-text Database 6 Hits
1 ZHANGZheng-lu,DENG Yong,LUO Chang-lin,LIUZu-qiang,YANG Hong;On Precise Engineering Surveying and Its Application[J];测绘通报;2006-05
2 WU Yan-qiang, HUANG Li-ren;The Application of Helmert Variance Estimation and Its Approximate Formulas in Adjustment of Traverse Network[J];测绘通报;2006-04
3 ZHANG Guo-qiang(512 team of Neimenggu Bureau of Nonferrous Metals Geological Exploration,Baotou 014040,China);The Application Research of GPS Technology in Precise Engineering Surveying[J];测绘与空间地理信息;2006-02
4 CHENG Ying-yan~①,CHENG Peng-fei~①,GU Dan-sheng~①,ZHANG Li~①,BEI Jin-zhong~①,GUO Chun-xi~②,PANG Shang-yi~②(①Chinese Academy of Surveying and Mapping,Beijing 100039,China;②Geodetic Data Processing Centre of State Bureau of Surveying and Mapping);Variance component's estimation in the combined adjustment[J];测绘科学;2005-02
5 WANG Xu hua,ZHAO De shen,WU Yin;Research on Weight Determination of Length and Angle in Combined Framework of Triangulation and Trilateration[J];测绘通报;2004-06
6 WANG Zhongfeng 1 (1 Dept. of Geology & Surveying, Changchun Institute of Technology,80 Tongzhi Street, Changchun, China, 130021);Synthetical Study to Estimate the Variance Components of Traverse Nets[J];武汉大学学报(信息科学版);2001-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 BAI Hongwei;ZENG Feng;Anhui Province Coal Mine Exploration Engineering Technology Research Center,Suzhou University;Changjiang Geotechnical Engineering Corporation (Wuhan);;Application and Analysis of Deformation Monitoring Technology in Reservoir Control Project[J];皖西学院学报;2015-05
2 GUO Junqiang;LI Qunke;;The Different on Classical Adjustment and Helmert of Survey Network[J];铁道勘察;2015-05
3 Zou Liqun;Wang Yaqiao;Zhu Rui;Huang Dangyu;Du Yuesuo;General Contraction Company of CCTEB;;Survey Technology of Super-high Independent Oblique Column with Super-large Section in Xinzheng International Airport Terminal T2[J];施工技术;2015-15
4 Wu Chuang;Zhu Rui;Zou Liqun;Wang Yaqiao;Huang Dangyu;General Contraction Company of CCTEB;;Control Network Layout and Accuracy Guaranty Measures of Large Construction Field Area Engineering Survey[J];施工技术;2015-15
5 SHI Yan;GAO Jun-qiang;College of Geomatics Engineering,Nanjing Tech University;;Application of robust helmert method of variance component estimation to three-dimensional adjustment[J];黑龙江工程学院学报;2015-03
6 Ma Liangliang;Lan Xiaoqi;Zhu Chunning;Yao Tao;Wang Kewei;School of Earth Science and Engineering,Hohai University;;Application of Helmert Variance Component Estimation in River-Crossing Leveling by Electro-optical Distance Measurement[J];勘察科学技术;2015-02
7 YUE Ren-bin;ZHANG Heng;LI Chao;Chongqing Survey Institute;;Application of CPⅢ to deformation monitoring[J];测绘工程;2015-02
8 JI Genjie;Shanxi Henan Shandong Railway Co.,Ltd.;;Discussion on adjusting different elevations at same bench mark in construction survey[J];铁道建筑;2014-12
9 FANG Changyuan;ZHAO Jianhu;LIANG Guodong;The Second Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.;School of Geodesy and Geomatics,Wuhan University;;Impact Analysis of Flow Velocity on the Positioning Accuracy of TSMS[J];测绘地理信息;2014-06
10 Zhu Yongguo;Huang Xiang;Li Shuanggao;Yang Guowei;Nanchang Hangkong University;Nanjing University of Aeronautics and Astronautics;;Precision Analysis and Layout Rules of Surveying Control Network for Aircraft Assembly[J];中国机械工程;2014-20
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 DENG Yong①②,ZHANG Zheng-lu①,HUANG Jiang-xiong③,WANG Ya-bin④,XIE Nian-sheng②,LV Geng-chao②(①School of Geodesy and Geomatics,Whuhan University,Wuhan 430079,China;②HydroChina Zhongnan Engineering Corporation,Changsha 410014,China;③Changsha Geotechnical Engineering and Surveying Institute,Changsha 410007,China;④Yangzhou Branch of Jiangsu Province Hydrology and Water Resources Survey Bureau,Jiangsu Yangzhou 225002,China);Discussion on coordinate transformation for engineering surveying[J];测绘科学;2011-05
2 LI Shu-liang①,LIU Cheng-long①,NI Xian-tao②,XU Xiao-zuo①(①School of Civil Eng.,Southwest Jiaotong University,Chengdu 610031,China;②Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China);Surveying method of CPⅢ vertical control network in high-speed railway[J];测绘科学;2011-01
3 BAITie-yong,YU Dai-jun,FU Chong-jiang(College of Earth sciences,Chengdu University of Technology,Chengdu 610059,China);Extracting simultaneous loop and independent loop of GPS network based on TGO software[J];测绘科学;2011-03
4 LIU Changjie DUAN Yu WANG Yi YE Shenghua(State Key Laboratory of Precision Measuring Technology & Instrument,Tianjin University,Tianjin 300072);Study on the Field Calibration Technology of Robot Flexible Coordinate Measurement System[J];机械工程学报;2010-18
5 LEI Wei-wei①,JIANG Bin②(①School of Surveying and Land Information Engineering,Henan Polytechnic University,Jiaozuo Henan 454000,China;②No.4 Geological Team,Henan Bureau of Coalfield Geology,Pingdingshan Henan 467000,China);Research on the coordinate transformation between national system and city system[J];测绘科学;2010-01
6 WANG Yi, LIU Chang-jie, REN Yong-jie, YE Sheng-hua (State Key Laboratory of Precision Measuring Technology and Instruments, Tianjin University, Tianjin 300072, China);Global calibration of visual inspection system based on universal robots[J];光学精密工程;2009-12
7 ZHAO Li-rong, LIU Yu-han, ZHU Wei,CAO Yong-gang,YU Xiao-bo(Changchun Institute of Optics, Fine Mechanics and Physics, Chinese Academy of Sciences. Changchun 130033,China);Measurement of aircraft attitude by spatial cosine relationship in single-station and planes to intersection in multi-station of electro-optical theodolite[J];光学精密工程;2009-11
8 Wang Binghai Kuang Tuanjie Su Wendong;Approach of GPS Horizontal Control Surveying in Long Curve Tunnel[J];铁道勘察;2009-05
9 BAI Yu-chun,HU Wen-yuan;GPS Control Surveying of Extra-long Diversion Tunnel:Research and Application[J];测绘通报;2008-10
10 XIE Yushang(1 School of Construction and Suverying Engineering Jiangxi University of Science and Technology,86 Hongqi Road,Ganzhou 341000,China);INFLUENCE ANALYSIS OF LATERAL TUNNEL BREAKTHROUGH ERROR[J];测绘信息与工程;2008-04
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 YU Ci-jun;SONG Kai;LI Jiang-xiong;JIN Zhang-jun;FAN Xin-tian;ZHANG Ming;Key Laboratory of Advanced Manufacturing Technology of Zhejiang Province,College of Mechanical Engineering,Zhejiang University;Aviation Industry Corporation of China Xi'an Aircraft Industry(Group)Co.Ltd;;Optimization of linear thermal deformation compensation coefficient matrix based on Levenberg-Marquardt algorithm[J];浙江大学学报(工学版);2016-06
2 WANG Luogang;WANG Tonghe;FAN Baixing;CHENG Zhiqiang;WANG Weijie;Information Engineering University;Zhejiang Huadong Construction Engineering Co.,Ltd;;Application of Levenberg-Marquardt algorithm to 3D trilateration network[J];测绘工程;2016-03
3 LIU Jin-heng;LV Yu-qing;GAO Sheng-fei;LI Wan-hong;61243 Troops;95812 Troops;;Analysis Methods for GPS Measurements about the Field of Data Quality[J];测绘与空间地理信息;2015-12
4 ZHANG Yun-zhi;JIANG Jiang;ZOU Fang;AVIC Beijing Aeronautical Manufacturing Technology Research Institute;State Key Laboratory of Precision Measurement Technology and Instruments, Tianjin University;;A Positioning Omni Directional AGV Method Based on Photoelectric Scanning[J];航空精密制造技术;2015-06
5 CHEN Hai-lin;XIONG Zhi;SONG Xiao-chun;XIA Qing-pei;School of Mechanical Engineering,Hubei University of Technology;;Vision Measurement Based on Standard Control Field[J];测控技术;2015-10
6 LI Li-juan;ZHAO Yan-hui;LIN Xue-zhu;College of Opto-electronic Engineering,Changchun University of Science and Technology;College of Mechanical and Electric Engineering,Changchun University of Science and Technology;;Application of WTLS in coordinate transformation of laser tracker[J];光学精密工程;2015-09
7 FENG Xiao-min;LIU Shang-guo;YU Sheng-wen;Shandong Provincial Key Laboratory of Geomatics and Digital Technology of Shandong Province,Shandong University of Science and Technology;Key Laboratory of Surveying and Mapping Technology on Island and Reef,National Administration of Surveying,Mapping and Geoinformation;;Discussion on the 3D coordinates combined measurement method in linear space[J];测绘科学;2015-08
8 JIN Zhang-jun;LI Jiang-xiong;YU Ci-jun;KE Ying-lin;Department of Mechanical Engineering,Zhejiang University;;Registration error analysis and evaluation in large-volume metrology system[J];浙江大学学报(工学版);2015-04
9 YANG Fan;FAN Baixing;LI Guangyun;YANG Zaihua;Information Engineering University;Beijing Satellite Environment Engineering Research Institute;;Discussion on Precise Three-Dimensional Coordinate Control Network in Field Large-Space Measurement[J];测绘科学技术学报;2015-02
10 Zhu Yongguo;Huang Xiang;Li Shuanggao;Yang Guowei;Nanchang Hangkong University;Nanjing University of Aeronautics and Astronautics;;Precision Analysis and Layout Rules of Surveying Control Network for Aircraft Assembly[J];中国机械工程;2014-20
【Secondary Citations】
Chinese Journal Full-text Database 9 Hits
1 ZHANG Zhenglu~1 DENG Yong~1 LUO Changlin~1 HU Xuqing~2(1 School of Geodesy and Geomatics,Wuhan University,129 Luoyu Road,Wuhan 430079,China)(2 Station Quality-inspected Branch of Surveying and Mapping Bureau,Hunan Province,693 Middle Shaoshan Road,Changsha 410007,China);Research on Precise Triangulated Height Surveying in Place of First Order Leveling[J];武汉大学学报(信息科学版);2006-01
2 LIU Zu-qiang , YANG Hong , LIAO Yong-long (Three Gorges Investigation Research Institute, Changjiang Water Resources Commission, Yichang 443003, China) (Three Gorges University, Yichang 443002, China) (Yangtze River Scientific Research Institute, Wuhan 430010, China);Deformation Analysis for the Permanent Shiplock of Three Gorges Project[J];水电自动化与大坝监测;2005-02
3 ZHANG Songlin 1 ZHANG Zhenglu 1 LUO Nianxue 1 (1 School of Geodesy and Geomatics, Wuhan University, 129 Luoyu Road, Wuhan 430079, China);Method for Simulative Calculation for Design of GPS Horigontal Network and Its Application[J];武汉大学学报(信息科学版);2004-08
4 LIU Changjian MA Gaofeng (Institute of Surveying and Mapping, Information Engineering University, 66 Middle Longhai Road, Zhengzhou 450052, China);BLUNDER TEST AND ROBUST SOLUTION OF VARIANCE COMPONENT ESTIMATION FOR HELMERT TYPE[J];测绘信息与工程;2002-06
5 by Wang Yingyong and Yan zhanglin//Surveying Department of East China Investigation and Design Institute;Research on the especially high accuracy construction network of hydropower stations[J];大坝与安全;2002-05
6 WANG SONGGUI (Institute of Statistics Beijing Polytechnic University, Beijing 100022 Institute of Applied Mathematics, the Chinese Academy Sciences, Beijing 100080);DENG YONGXU (Division of Social Science, Beijing Statistical Bureau 100053);IMPROVED ESTIMATORS OF VARIANCE COMPONENTS[J];应用数学学报;1999-01
7 Wang Zhizhong (Central South China University of Technology, Changsha, 410083);Maximum Posterior Estimation of Variance Components[J];测绘工程;1998-03
8 Tian Yuanping;Sun Min(Hunan U rban Construction College, Yiyang City Hunan, 413000;Central-South China U niversity of Technology, Changsha, 410083);A Simplified Algorithm of Helmert's Variance Components Estimation[J];测绘工程;1998-01
9 Huang Liren (Geodetic Brigade, State Seismological Bureau);ESTIMATION OF TWO VARIANCE COMPONENTS IN TRILATELATION NETWORK[J];地壳形变与地震;1989-01
Similar Journals
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved