Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Geospatial Information》 2010-01
Add to Favorite Get Latest Update

Surveying Technology of Precise Control in High-speed Railway

WANG Xihe (China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)  
The paper introduced the collectivity frame,the primary content,characteristics,the network construction methods and applications of this system.The demands and research aspects of the technology were illuminated compendiously,too.
【CateGory Index】: P228.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 LIU Jia-chen(The Second Surveying and Mapping Institute of Jilin Province,Changchun 130062,China);Research on Accuracy of Precise Engineering Control Survey for High-Speed Railway[J];Geomatics & Spatial Information Technology;2011-06
2 KANG Jian-song1,HUANG Teng1,LI Dong-sheng2,LIU Ling1(1.School of Earth Sciences and Engineering,Hehai University,Nanjing 210098,China;2.Troops 91561,Guangzhou 510320,China);Research on data processing method of ballastless track GRP points in high-speed railway[J];Engineering of Surveying and Mapping;2012-06
【Citations】
Chinese Journal Full-text Database 2 Hits
1 ZHANG Yingxiang1,2,HU Bo1,2,LUO Tao1,HOU Kai1(1.School of Geodesy and Geomatics,Wuhan University,Wuhan 430070,China ;2.Laboratory of Precision Engineering and Industrial Surveying State Bureau of Surveying and Mapping,Wuhan 430079,China);Re-testing Technology of CPII Control Network for the Beijing-Shanghai High-speed Railway[J];Geospatial Information;2008-03
2 WU Dijun1,2, XIONG Wei2, ZHANG Jianjun2 (1. School of Geodesy and Geomatics, Wuhan University, Wuhan 430079, China; 2. China Zhongtie Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan 430050, China);On Accuracy Requirement for Horizontal Control Network of Bridge Construction[J];Geospatial Information;2008-06
【Co-citations】
Chinese Journal Full-text Database 4 Hits
1 XIONG Wei, WU Dijun, LI Jiankun (China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan 430050, China);Design and Practice of GPS Horizontal Control Network for Bridge Construction[J];Geospatial Information;2009-01
2 Wu Dijun (China Railway Major Bridge Reconnaissance & Design Institute CO. LTD. ,Wuhan 430050,China);Design and implementation of the construction control net for the Ma'anshan Bridge over Yangtze River[J];Geotechnical Investigation & Surveying;2010-04
3 Jia Dongrong(China Railway No.4 Bureau Group,No.6 Engineering Co.,Ltd.,Wuhu 241000,China);Design and Research of Bridge Construction Control Net[J];Value Engineering;2010-09
4 JIANG Ning;Suburb Highway Maintenance Department Handan Transport Bureau of Hebei Province;;Measuring Technology for Bridge Construction[J];Transportation Standardization;2014-16
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WU Zhong-ru,et al.(Qinhangdao Surveying Group,Qinhuangdao 066001,China);Control surveying of precision engineering in high-speed railway construction[J];Journal of Changchun Institute of Technology(Natural Sciences Edition);2009-02
2 GE Yong-hui,ZHAO Gang,YANG Xiao-qin(College of Mining Engineering,Taiyuan University of Technology,Taiyuan 030024,China);The stable realiztion of PDA communication with total station[J];Engineering of Surveying and Mapping;2009-05
3 LAI Zu-long~(①②) CHENG Xin-wen~①CHEN Xing-yi~①MING Zu-tao~①(①Faculty of Information Engineering,China University of Geosciences,Wuhan 430074,China;②School of Remote Sensing and Information Engineering,Wuhan University,Wuhan 430079,China);Research on some key technologies of data processing in CPⅢsurveying[J];Science of Surveying and Mapping;2008-S1
4 FU Heng-you①②,YANG Song-lin①(①Beijing Jiaotong University,Beijing 100001,China;②The Third Survey & Design Institute,Tianjin 300142,China);Controlling survey scheme of GPS in long tunnel for the high-speed railways[J];Science of Surveying and Mapping;2009-05
5 LIU Ling-jie,YUAN Yu-lei,WEI Jian-dong;Analysis of Oblique Mercator Projection Application in High-speed Railway Surveying[J];Bulletin of Surveying and Mapping;2009-02
6 ZHANG Zheng-lu~1, ZHANG Song-lin~1, WU Zhi-gang~2, WANG Wei-guo~2, ZHOU Tong~2,ZHANG Guo-liang~2 (1. School of Geodesy and Geomatics, Wuhan University, Wuhan 430079,China; 2. Tianjin Investigation and design Institute, Chinese Ministry of Hydroenergy, Tianjin 300222,China);Research on the Allowable Value of Lateral Breakthrough Error for Super Long Tunnel from 20 to 50 km[J];Acta Geodaetica Et Cartographic Sinica;2004-01
7 HUANG Zhi-wei,LIU Cheng-long,WANG Hua-guang,HE Bo,ZHAO Meng-jie(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Research of lapping methods between adjacent regions for CPⅢ plane network in high-speed railway[J];Journal of Railway Science and Engineering;2010-06
8 GUO Xiaolong (China West Normal University, Nanchong 637002, China);Practical Research and Development for Embedded Mobile GIS System Based on PDA[J];Geospatial Information;2007-04
9 ZHANG Yingxiang1,2,HU Bo1,2,LUO Tao1,HOU Kai1(1.School of Geodesy and Geomatics,Wuhan University,Wuhan 430070,China ;2.Laboratory of Precision Engineering and Industrial Surveying State Bureau of Surveying and Mapping,Wuhan 430079,China);Re-testing Technology of CPII Control Network for the Beijing-Shanghai High-speed Railway[J];Geospatial Information;2008-03
10 WANG Guo-xiang LAI Hong-bin (China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031,China);Establishment and Precision Control of Track Control CPⅢ Network of High Speed Railway[J];High Speed Railway Technology;2012-01
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 TU Zhi-ming(Shanghai Insitute of Surveying and Mapping,Shanghai 200063,China);The Analysis on Focal & Difficult Points of Plane Surveying Method of GRP Points in High-speed Railway[J];Modern Surveying and Mapping;2013-04
2 ZHENG Hong-da;LIU Xue-hai;Heilongjiang Province Water Conservancy & Hydropower Investigation,Design and Research Institute;;Discussion OnMeasurement Management System of High-speed Rail Engineering[J];Heilongjiang Science and Technology of Water Conservancy;2014-07
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHENG De hua;On Accuracy Requirement for Basic Horizontal Construction Control Network of Extra Large Bridge[J];Bulletin of Surveying and Mapping;2003-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved