Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Earth and Environment》 2013-01
Add to Favorite Get Latest Update

Comparative Study of Treatment Project for Internal Source Pollution of Inland Lake Eutrophication

WANG Ying1,WANG Dao-wei1,LI Hui1,ZHAO Shi-min1,2, LI Zhao-xin1,PAN Xue-jun1(1.Faculty of Environment Science and Engineering,Kunming University of Science and Technology,Kunming 650500,China;2.Kunming Environmental Monitoring Center,Kunming 650228,China)  
Lake eutrophication is a serious environmental problem.China is carrying out research on eutrophication and its comprehensive treatment at present.The effects of three typical inland lake internal source pollution treatment projects,such as sediment dredging engineering,ecological diversion project and aquatic phytoremediation,were analyzed in this paper.The operating status of these three methods both at home and abroad,and their merits and demerits in treating lake pollution were illustrated.Simultaneously,the authors pointed out that there are limitations when one kind of method is used alone in solving the problem of eutrophication.On this basis,taking the water quality control project of the Dianchi Lake for example,the treatment effect and the combined use of the three engineering projects were investigated.
【Fund】: 国家高技术研究发展计划(863计划)(2010AA06Z301);; 国家水体污染控制与治理科技重大专项(2010ZX07102-006)
【CateGory Index】: X524
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved