Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

A Study on Key Problems of μC/OS-Ⅱ Running in DSP Flash

ZHU Aijun1,DAI Qunliang2 (1.School of Electronic Engineering,Guilin University of Electronic Technology,Guilin 541004,China;2.Guangxi Liugong Machinery Co Ltd,Liuzhou 545007,China)  
In this paper,some problems are described in detail when μC/OS-Ⅱ runs in Flash.There are two problems in the system.One is the Intelligent Construction Machinery does not run according to the pre-established path,the other is real time μC/OS-Ⅱ runs away with multitask.We analyzed the main causes and put forward three solutions;one of which is introduced in detail.The two problems have been faultlessly solved by the three solutions in this project.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved