Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Contemporary China History Studies》 2018-05
Add to Favorite Get Latest Update

The Dilemma and Countermeasures of Flood Control Mobilization in the Early Days of New China——Taking the Lower Reaches of the Yellow River as An Example

Guo Saifei;  
Facing the dilemma of low enthusiasm of cadres and masses,prominent contradictions between production and flood control,paralysis of thought and empiricism in the mobilization work of flood control in the early days of the founding of New China,the Communist Party of China and the people’s government actively responded,established the Yellow River Water Conservancy Commission,constructed a top-down flood control command system to carry out the flood control publicity,current affairs education and patriotic labor competition,raised wage standards and implemented material rewards.These measures had enhanced the people’s awareness of flood control,effectively alleviated the contradiction between flood control and production work,improved the quality and efficiency of flood control projects,promoted the innovation and popularization of engineering technology,enriched the recreational life of flood control sites,stabilized the peasants’production mood,maintained social order and established the good image of the CPC and the government.Generally speaking,flood control mobilization work in this period was successful and efficient.The important reason was that flood control was regarded as a regular and important work,which reflected the trend of water conservancy work changing from temporary and emergency to regular and constructive.
【Fund】: 国家社会科学基金重大项目“新中国治水史”(14ZDB049)的阶段性研究成果
【CateGory Index】: K27
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved