The Practice of Adding a Gas Bypass On 630 MW Units Desulphurization Booster Fan

He Jun(Datang Lueyang Power Co.,Ltd,Lueyang 724300,China)  
With the policy of national environmental protection is more and more strict,the current thermal power plant desulfurization system bypass flue has must also complete removal and closure.Based on the operation of the 2 units of 630 MW desulphurization booster fan and added a bypass flue baffle door engineering practice,obtained a safe,economic,reliable enterprise efficiency,paper has also provided some certain reference significance to the same booster fan for large units.
【CateGory Index】: X773
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Tong Jialin1,Ye Xuemin1,Mao Jieyu2,Wu Siming2 (1.School of Energy Power and Mechanical Engineering,North China Electric Power University,Baoding 071003,China;2.Zhejiang Beilun Power Plant,Ningbo 315800,China);Energy-saving Analysis on Integrated Operation of Induced Draft Fan and Booster Fan[J];Electric Power Science and Engineering;2011-05
2 Sun Hao,Li Yi,Jiang Cong-jin(Shenhua Guohua(Beijing) Electric Power Research Institute Co,Ltd.,Beijing 100025,China);Research on Integration Mode of IDF and Booster Fan[J];North China Electric Power;2012-05
3 CHEN Xing,ZHOU Liguo Datang Xinyang Hua'yu Power Generation Co Ltd,Xinyang 464100,Henan Province,PRC;OPERATIONAL CHARACTORS OF BOILERS EQUIPPED FOR ULTRA-SUPERCRITICAL 660 MW UNIT AFTER COMBINING THE BOOSTER AIR FAN IN DESULPHURIZATION SYSTEM AND THE INDUCED DRAFT FAN INTO ONE[J];Thermal Power Generation;2010-05
【Co-citations】
Chinese Journal Full-text Database 5 Hits
1 ZHANG Tianjing(Datang Lueyang Power Co.,Ltd.Lueyang,Shanxi 724300);Discussion on 630 MW Units of WFGD System After Gas Baffle Bypass Back-out and Closedown[J];Industrial Safety and Environmental Protection;2013-06
2 Li Debo1,Di Wanfeng2(1.Electric Power Research Institute,Guangdong Power Grid Corporation,Guangzhou 510060,China;2.China Resources Power(Hezhou)Co.,Ltd.,Hezhou 542709,China);Application of Three-in-One Induced Draft Fan in a 1 045MW Thermal Power Generation Unit[J];Power Equipment;2013-05
3 XU Peng (Fengcheng Phase II Power Plant of Ganneng Co.Ltd.,Fengcheng 331100,Jiangxi,China);Optimization and Economic Analysis on Operational Mode of Booster Fan[J];Energy Research and Management;2011-01
4 WANG Da-da1,QIU Ying-hui2,PING An2,LIU Chao2(1.Yunnan Electrical Power Testing and Research Institute(Group)Co.,Ltd.,Kunming 650217,Yunnan,China;2.School of Electrical and Electronic Engineering,North China Electric Power University,Beijing 102206,China);Problems and Considerations on Energy-Saving Generation Dispatching in Yunnan[J];Power System and Clean Energy;2012-12
5 DAI Hang-dan1,LUO Zhi-hao1,LIU Wei-rong2,WU Zhi-jing3(1.Z(P)EPC Electric Power Research Institute,Hangzhou 310014,China;2.Zhejiang Thermal Power Construction Company,Hangzhou 310016,China;3.Zhejiang Zheneng Lanxi Power Generation Co.,Ltd.,Lanxi Zhejiang 321100,China);Discussion on Generator Units Reliability Improvement after Abolition of FGD Bypass Damper[J];Zhejiang Electric Power;2013-07
【Secondary Citations】
Chinese Journal Full-text Database 8 Hits
1 LI Yan-qing (Tianjin Guohua Panshan Power Plant Co. Ltd., Tianjin 301907, China);Techno-economic Comparison of Boost Fans in Flue Gas Wet Desulfurization System for 600 MW Thermal Power Plant[J];Electric Power Technologic Economics;2007-03
2 JIANG Cong-jin1, JIANG Shi-yuan2, FENG Qian-jun1 (1. Shenhua Guohua Electric Research Co., Ltd, Beijing 100069, China; 2. Beijing University of Posts and Telecommunications, Beijing 100876, China);Techno-economic Analysis on Integration of Induced Draft Fan of Boiler and Booster Fan of Desulphurization System[J];Electric Power Technologic Economics;2009-02
3 ZHU Wen-jie1,HUANG Hui1,WANG Guan-hua2(1.Guangdong Yudian Group Co.,Ltd.,Guangzhou 510630,China;2.Guangdong Electric Power Design Institute,Guangzhou 510660,China);Type Selection of Induced-dralt Fan for 600MW Supercritical Coal-Fired Power Unit[J];Hubei Electric Power;2009-03
4 YE Yong-jian(East China Electric Power Design Institute,Shanghai 200063,China);Discussion on integration modes of induced draft fans and booster fans[J];East China Electric Power;2007-11
5 LI Yuan-fei;Analysis on the Combination of Induced Draft Fan with Desulphurization Booster Fan in 300 MW Unit[J];Sci-Tech Information Development & Economy;2007-36
6 ZHAO Zhen-zhou1,JIN Bao-sheng1,XIONG Yuan-quan1,ZHAO Jian-zhi1,SUN Ke-qin2(1.Southeast China University,Nanjing 210096,Jiangsu Province,PRC;2.Jiangsu Provincial Suyuan Environmental Protection Co Ltd,Nanjing 21024,Jiangsu Province,PRC);STUDY ON INFLUENCE OF FGD SYSTEM UPON FURNACE IMPLOSION[J];Thermal Power Generation;2007-04
7 ;Type Selection of Flue Gas Desulferization Booster Fan[J];Shandong Electric Power;2005-05
8 PENG Hong-wen , MA An ( North China Power Engineering( Beijing) Co., Ltd., Beijing 100120, China);Installation of ID fan combined with FGD booster fan for 1 000 MW units[J];Electric Power;2009-10
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved