BLASTING DEMOLITION OF ROCK-DYKE AT INLET OF NO 2 WATER-DIVERSION TUNNEL IN HONGJIADU HYDROPOWER STATION

LIU Mei-shan~(1,2),LI Yong-chi~1,ZHANG Zheng-yu~2,WU Xin-xia~2,ZHANG Wen-xuan~2 (1.University of Science and Technology of China,Hefei 230027,China; 2.Yangtze River Scientific Research Institute,Wuhan 430010,China)  
In Hongjiadu Hydropower Station,the rock-dyke at the inlet of No.2 water-diversion tunnel is only 9m away from a lock gate necessary to be protected.The water level outside the cofferdam is higher than the top of the cofferdam.There are a lot of rock residues on surface and front of the rock-dyke.In addition,there is a short time limit for demolition of the rock-dyke.Under above-mentioned difficult conditions,the rock-dyke is demolished by once-through millisecond blasting with vertical and inclined deep-holes.In this paper,the determination of blasting plan,the selection of blasting parameters,the design of firing circuit and safety precautions are expunded.At the same time,the experience and knowledge about this project are introduced.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved