DYNAMIC MONITORING AND ANALYSIS ON BLASTING AND EXCAVATING OF INLET TUNNELS OF GEHEYAN HYDROPOWER PLANT

Gao Mingan Bian Zhihua Jiang Deyun(Yangtze River Scientific Research Institute,Wuhan 430010)  
Taking the dynamic monitoring of excavating the inlet tunnels of Geheyan Hydropower Plant as an example,the safety monitoring effect on engineering monitoring is discussed in this paperThe monitoring methods of blasting vibrating seismicprofile and the single hole sonic testing are combined to use in the completion of the whole dynamic monitoring process of the construction of excavating the inlet tunnelsThe monitoring result is also analyzed and evaluated