Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Industrial Engineering Journal》 2006-06
Add to Favorite Get Latest Update

Production Optimization of Capacity Constraints Resource in DBR Theory

GUO Yong-hui~(1,2),QIAN Xing-san~1(1.School of Management,University of Shanghai for Science and Technology,Shanghai 200093,China;2.Department of Industrial Engineering,Zhengzhou Institute of Aeronautical Industry Management,Zhengzhou 450015,China)  
In order to optimize the production of capacity constraints resource(CCR) in Drum-Buffer-Rope(DBR) theory,back-scheduling method with EDD or SPT rule is used to level the ruins of CCR.The sequence of orders after being leveled is used as the initial solutions.At the same time,the mixed objective functions of CCR are also given,that is,enhancing throughput and the on-delivery rate.Finally,tabu algorithm is proposed to optimize the production of CCR.Results of the example prove the validity of this method.
【Fund】: 上海重点学科资助项目(T0502);; 高校博士点基金(20050252008)
【CateGory Index】: TP278
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 YANG Li-yan,QIAN Xing-san (Research Institute of Industrial Engineering/Microelectronics Development Research Center,University of Shanghai for Science and Technology,Shanghai 200093,China);Bottleneck Identification and Management in Wafer Fabrication[J];Semiconductor Technology;2007-12
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Jing, RONG Chao, GONG Zhao-bo(School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083);Business Process Dynamic Improvement Based on Lean Production and Theory of Constraints[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2001-03
2 YE Tao\|feng(School of Economics & Management, East China Ship\|Building Institute, Zhenjiang 212003, China)\ \;A Simulation Method on Buffer-setting in Production[J];Group Technology & Production Modernization;2003-01
3 XIAO Jian-mei,HUANG You-fang,LI Jun-jun,WANG Xi-huai(Institute of Logistics Engineering, Shanghai Maritime University, Shanghai 200135,China);Vehicle Routing Problem Based on Discrete Particle Swarm Optimization[J];Systems Engineering;2005-04
4 HAO Yan hui,HAO Yong jing,WANG Mo,ZHANG Xue min (Management School of Hebei University of Technology,Tianjin 300130,China);Comparing and Integrating Between MRPⅡ and JIT[J];INDUSTRIAL ENGINEERING JOURNAL;2000-03
5 TANG Wei-jun, FAN Hong-da, SUN A-nan (Department of Industrial Engineering & Management, Shanghai Jiao Tong University, Shanghai 200030,China);Application of Theory of Constraints to Supply Chain Management[J];Industrial Engineering Journal;2003-04
6 QI Xiao-yao (School of Management,Tianjin University,Tianjin 300072,China);Management Method and Application Based on Theory of Constraints[J];Industrial Engineering Journal;2005-01
7 CHEN Jian-hua~1, PENG Hong-guang~2 (1.School of Management, Huazhong University of Science and Technology, Wuhan 430074, China; 2.Dept. of Economics and Management, Zhejiang University of Science and Technology, Hangzhou 310012, China);Integrated Production Planning and Controlling Model of MRPⅡ, JIT and TOC in Time-based Competition[J];Industrial Engineering Journal;2005-02
8 Bai Ming(School of Economics and Management,Beihang University,Beijing 100083,China);Reengineering of production Systems and Its Evaluation Based on Constraints[J];Industrial Engineering Journal;2005-05
9 Wang Sun-xin(Institute of Technology,Xi'an University of Technology,Xi'an 710082,China);A Look-ahead Heuristic Algorithm for Dynamic Identify Bottleneck Machine[J];Industrial Engineering Journal;2008-04
10 Li Jian1) Gu Peiliang2)( 1)Tianjin Institute of Technology,Tianjin,300191 2)Tianjin University,Tianjin,300072);Coordination and Control on MRPⅡ/JIT-Hybrid System[J];INDUSTRIAL ENGINEERING JOURNAL;1998-02
China Proceedings of conference Full-text Database 1 Hits
1 LI Gui-fen, JU Yan-bing (School of Management and Economics, Beijing Institute of Technology, Beijing 100081,China.;Method of JSP Optimization Based on Simulation and GA[A];[C];2006
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved