Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Industrial Engineering Journal》 2013-01
Add to Favorite Get Latest Update

Postponed Production Optimization for Mass Customization Manufacturer

Qin Yan-hong1,Xiong Dan-ping1,Li Yu-yu2(1.School of Management,Chongqing Jiaotong University,Chongqing 400074,China; 2.College of Computer and Information Science,Chongqing Normal University,Chongqing 400047,China)  
Production cost for mass customization manufacturers with postponed strategies adopted or not is addressed in this paper.Models are established for both cases.Then,an extending M/M/1 queuing model is applied to minimize the total cost of production.Through simulation and sensitivity analysis,it is shown that the customers' waiting time and the number of product categories have significant effect on the total cost for the manufacturers.This provides a theoretical support for the manufacturers to correctly determine customer order decoupling point(CODP).Thus,it is a basis for a manufacturer to make decision in implementing a postponed strategy.
【Fund】: 国家自然科学基金资助项目(71102178)
【CateGory Index】: F273;F406;F224
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 7 Hits
1 Xu Xue-jun,Zhou Wu-jing(School of Business Administration,South China University of Technology,Guangzhou 510641,China);Simulation Study on Virtual Inventory Decision Making[J];Industrial Engineering Journal;2009-05
2 Jin Qing~1,Zhang Zhong~1,Pan Xue-tao~2,Wang Xiao-yu~1,Ge Bing~1 (Changzhou Institute of Technology 1.School of Business Administration,Changzhou 213022,China; 2.School of Photoelectric Engineering,Changzhou 213002,China);A Visualized E-Kanban System for Small-Batch JIT Production[J];Industrial Engineering Journal;2011-03
3 RAO Kai,DAN Bin,LIU Yu(School of Economics & Business Administration,Chongqing University,Chongqing 400044,China);Cost optimization model of manufacturer implementation postponement strategy in mass customization[J];Computer Integrated Manufacturing Systems;2007-09
4 DAN Bin1,RAO Kai1,2,LI Hai-yan1 (1.College of Economics & Business Administration,Chongqing University,Chongqing 400044,China;2.Scuola Superiore Sant'Anna di Studi Universitari e di Perfezionamento di Pisa,Pisa 56127,Italia);Cost optimization model of supply chain implementation postponement strategy in mass customization[J];Computer Integrated Manufacturing Systems;2009-02
5 LI Dan-dan,WANG Ju-xiang(College of International Business College,Qingdao University,Qingdao 266071,China);Customer Order Decoupling Point position for mass customization[J];Journal of Qingdao University(Natural Science Edition);2010-02
6 SHAO Xiao-feng,JI Jian-hua(Antai School of Management, Shanghai Jiaotong Univ., Shanghai 200052, China);Research on Impact of Postponement Strategies on Inventory Cost in Mass Customization[J];Systems Engineering-Theory Methodology Application;2004-05
7 YANG Zhi-lin~1,TIAN Yu-min~2,YANG Shan-lin~3(1.Department of Mathematics,Hefei University of Technology,Hefei 230009,China;2.Department of Basic Courses;Artillery College of PLA;Hefei 230001,China;3.School of Management,Hefei University of Technology,Hefei 230009,China);A Study of Partial Backorder Policy under Random Demand[J];Journal of Systems & Management;2009-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 SHAO Xiao-feng(Antai College of Economics & Management,Shanghai Jiaotong University,Shanghai 200052,China);Coordination of the Pricing and Delivery Time of Mass Customization Products based on Commission Contract[J];Systems Engineering;2011-09
2 Xu Xue-jun,Zhou Wu-jing(School of Business Administration,South China University of Technology,Guangzhou 510641,China);Simulation Study on Virtual Inventory Decision Making[J];Industrial Engineering Journal;2009-05
3 Jin Qing,Ding Zhao-guo(School of Business Administration,Changzhou Institute of Technology,Changzhou 213022,China);An Approach to the Design of Dynamic Kanban System for a Multi-Product Series-Parallel Production System[J];Industrial Engineering Journal;2011-06
4 XU Xue-jun,ZENG Bin,YU Yuan,HUANG Liang(IE Center,South China University of Technology,Guangzhou 510640,China);Simulation Research on Vendor-managed Inventory Based on Manufacturing Postponement Strategy[J];Industrial Engineering and Management;2009-01
5 NI Ming,LIAO Ruihui(College of Economics and Management,East China Jiaotong University,Nanchang 330013,China);Study of Reverse Logistics Cost-control Model of Implementing MC for SDN Enterprises[J];Industrial Engineering and Management;2010-04
6 ZHAO Jun1,YAN Ping1,ZHANG Yan2,LUO Jingquan1(1.The State Key Laboratory of Mechanical Transmission,Chongqing University, Chongqing 400044,China;2.Chongqing Haiteke System Integration Co.,Ltd.,Chongqing 400030,China);Software design of E-kanban on mixed model assembly line[J];Journal of Chongqing University;2012-S1
7 WANG Zhiliang Faculty of Mechanical Engineering,Nanjing Institute of Technology,Nanjing 211167,China;Customization module's cost model and evaluation under supply chain[J];Computer Engineering and Applications;2012-03
8 RAO Kai,DAN Bin,LIU Yu(School of Economics & Business Administration,Chongqing University,Chongqing 400044,China);Cost optimization model of manufacturer implementation postponement strategy in mass customization[J];Computer Integrated Manufacturing Systems;2007-09
9 DAN Bin1,RAO Kai1,2,LI Hai-yan1 (1.College of Economics & Business Administration,Chongqing University,Chongqing 400044,China;2.Scuola Superiore Sant'Anna di Studi Universitari e di Perfezionamento di Pisa,Pisa 56127,Italia);Cost optimization model of supply chain implementation postponement strategy in mass customization[J];Computer Integrated Manufacturing Systems;2009-02
10 PANG Ru-ying1,LIU Da-cheng2,LI Qiang1,SUN Hong-hua1,WANG Gao-nan2(1.Department of Industrial Engineering,Inner Mongolia University of Technology,Hohhot 010051,China;2.Department of Industrial Engineering,Tsinghua University,Beijing 100084,China);Process flow reorder model based on cost control strategy[J];Computer Integrated Manufacturing Systems;2009-07
China Proceedings of conference Full-text Database 1 Hits
1 WU Yu-feng (School of Management, Dalian University of Technology, Dalian 116024, China);Selection Model Research of Postponement Strategy Based on AHP[A];[C];2006
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 CHE Jian-guo1,HE Zhen2,KONG Xiang-fen3(1.TEDA College,Nankai University,Tianjin 300457,China;2.School of Management, Tianjin University,Tianjin 300072,China;3.School of Aeronautical and Engineering,Civil Aviation University of China,Tianjin 300300,China);The Applicability of Lean Production System under Multi-item and Low-volume Settings[J];Commercial Research;2009-09
2 ZHANG Xi lun,YANG Guang xun,ZHU Jian jun (Beijing University of Areonautics and Astronautics,Beijing 100083,China)$$$$;Putting CRM in practice combined with MC[J];Group Technology & Production Modernization;2001-03
3 LIU Xiao bing 1, DONG Jian hua 1, SUN Wei 1, JIANG Ping 2, HAN Yong sheng 2 ( 1. CIMS Cent., Dalian Univ. of Technol., Dalian 116024, China; 2. ERC of IM&D, Inst. of Software, CAS, Beijing 100080, China );Product data management for mass customization[J];Journal of Dalian University of Technology;2000-06
4 YAO Jian-ming~1,PU Yun~2 (1. School of Economics and Management, Southwest Jiaotong University, Chengdu 610031, China; 2. Graduate School,Southwest Jiaotong University,Chengdu 610031,China);Scheduling Optimization of Supply Chain in Mass Customization Based on Dynamic Production Ability Restriction[J];Systems Engineering;2005-02
5 DING Bo-hui1,2,QI Er-shi2,ZHANG Jie2,YANG Zuo-gang3 (1.School of Mechanical Engineering,2.School of Management,Tianjin University,Tianjin 300072,China;3.MBA Education Center,Tianjin University of Finance & Economics,Tianjin 300222,China);Manufacturing Execution System based on Toyota Production System[J];Industrial Engineering Journal;2007-05
6 Li Chao-lin(Department of LTD Technique,Bingshan Group Dalian Refrigeration Co.,Dalian 116033,China);Production Control Based on Kanban-net and Lean Production[J];Industrial Engineering Journal;2008-06
7 XU Fu yuang 1,LI Min 1,GU Xin jian 2,HAN Lu 1,XIANG Yu hua 1 (1 Research Inst.Of System Engineering,University of Shanghai for Science and Technology,Shanghai 200093; 2.Mechanical Department,Zhejiang University,Zhejiang Hangzhou 310027);Basic Thought for Actualizing Mass Customization and Its Space-time Integrated Optimization Model[J];Journal of Industrial Engineering and Engineering Management;2002-02
8 WANG Hai-jun~(1,2),MA Shi-hua~1,ZHAO Yong~2(1.School of Management,Huazhong University of Science and Technology,Wuhan 430074,China;2.Department of Control Science and Engineering,Huazhong University of Science and Technology,Wuhan 430074,China);Models for Multi-level Supply Control in Postponement and Mass Customization[J];Journal of Industrial Engineering and Engineering Management;2005-01
9 DAI Dao-ming~(1,2),YANG Shan-lin~2(1.School of Information Engineering,Anhui University of Finance & Economics, Bengbu 233041,China;2.School of Management,Hefei University of Technology,Hefei 230009,China);Joint Optimal Dynamic Pricing and Lot Sizing Problem with Backlogging[J];Journal of Industrial Engineering and Engineering Management;2009-04
10 SHAO Xiao feng, HUANG Pei qing, JI Jian hua (Aetna School of Management, Shanghai Jiao Tong Univ., Shanghai 200052, China);An Analysis of Mass Customization[J];Industrial Engineering and Management;2001-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved