Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Industrial Engineering Journal》 2015-01
Add to Favorite Get Latest Update

Optimization Algorithm for Batch Planning with the Information of Billet Inventory

Wu Ming-hong;Zhang Feng-li;Dong Guang-jing;Wang Bai-lin;Baotou Seamless Tube Mill;Dongling School of Economics and Management,Beijing University of Science and Technology;  
A steel tube batch plan problem based on inventory information is studied. For the problem,a batch planning model is established with the objective of minimizing the billet shuffles. Combined with the feature of the problem,a two-stage optimization algorithm based on the billet continuous shuffling is designed: first,determining the current optimal billet and searching the billets in the lower floor on the same stock to match the best continuous rolling billet; second,improving the first stage solution for searching the continuous rolling billets in each rolling location. Through experimental verification based on the actual production data,the billet shuffles decrease significantly relative to the classic heuristic algorithm. The model and algorithm are proved feasible and effective.
【Fund】: 中央高校基本科研业务费资助项目(FRF-SD-12-011B FRF-SD-12-012B)
【CateGory Index】: TG338
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 DONG Guang-jing;SHI Can-tao;LI Tie-ke;WANG Bai-lin;Dongling School of Economics and Management,University of Science and Technology Beijing;Engineering Research Center of MES Technology for Iron & Steel Production,Ministry of Education;;Optimization model of steel tube location decision based on clustering and constraint satisfaction algorithm[J];Journal of University of Science and Technology Beijing;2014-01
2 DONG Guang-jing;LI Tie-ke;WANG Bai-lin;BEI Liang;Dong ling School of Economics and Management,University of Science and Technology Beijing;Engineering Research Center of MES Technology for Iron &Steel Production,Ministry of Education;;Model and Algorithm of Tube Billet Storage Stacking Problem[J];Industrial Engineering and Management;2013-06
3 LIU Shi-xin~1 SONG Jian-hai~2 ZHOU Shah-chang~1 (1.School of Information Science & Engineering,Northeastern University;Key Laboratory of Process Industry Automation,Ministry of Education,Shenyang Liaoning 110004,China;2.MES Business Department,Shanghai Baosight Software Limited Company,Shanghai 201900,China);Model and algorithm for solving hot strip rolling batch planning problems[J];Control Theory & Applications;2007-02
4 TANG Lixin YANG Zihou (Institute of Systems Engineering, Northeastern University, Shenyang 110006);INTEGER PROGRAMMING MODEL AND MODIFIED GENETIC ALGORITHM FOR OPTIMAL TURNED OUT SLAB PILE FOR HOT ROLLINE SCHEDULE[J];;2000-04
5 TANG Li xin 1, YANG Zi hou 1, HU Guo fen 2 (1.Institute of Systems Engineering, Northeastern University, Shenyang 110006, China; 2.Shanghai Baoshan Iron & Steel Complex, Shanghai 201900, China);Effective heuristic algorithm for optimal turned-out slab pile problem[J];Journal of Systems Engineering;2001-02
6 Wu Xiuli Li Shujian Du Yanhua University of Science and Technology Beijing,Beijing,100083;Research on Batch Scheduling Problem in a Flexible Job Shop[J];China Mechanical Engineering;2010-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Tan Changsong(University of Science & Technology Beijing);Management of Production Order in MES for Silicon Steel[J];Anhui Metallurgy;2010-03
2 Tu Xue-ping,Zhang Wen-xin,Li Tie-ke (School of Economy and Management,University of Science and Technology,Beijing 100083,China);Genetic Algorithm-Based Multi-Objective Optimization of Hot Rolling Process[J];Industrial Engineering Journal;2009-06
3 Tang Lixin(Northeast University,Shenyang,China);Intelligent Optimization-based Production Planning and Scheduling in Iron and Steel Industry[J];Chinese Journal of Management;2005-03
4 WANG Min,LI Tie-ke(School of Economy and Management,University of Science and Technology,Beijing 100083,China);Improved Partheno-genetic Algorithm for Turned-out Slab Stack Problem[J];Industrial Engineering and Management;2009-04
5 JIN Chun,WANG Guang-min,GAO Peng (Institute of Systems Engineering,Dalian University of Technology,Dalian 116024);Modeling and Optimization on Operation Scheduling for a Steel Plate Yard in a Shipyard[J];Industrial Engineering and Management;2009-06
6 Shuai Qi1,2,Yao Xi-fan2(1.Guangdong Institute of Science and Technology,Zhuhai 519090,China; 2.School of Mechanical& Automotive Engineering,South China University of Technology,Guangzhou 510640,China);A Hybrid Genetic Algorithm for Flexible Job-Shop Scheduling Problem[J];Industrial Engineering Journal;2013-01
7 Liu Yang;Xiong Junxi;Cheng Chen;Peng Jun;;Optimization of Flexible Job-shop Scheduling with Lot-splitting Production Based on Improved GA[J];Beijing Automotive Engineering;2013-06
8 DONG Guang-jing;LI Tie-ke;WANG Bai-lin;BAI Liang;Dongling School of Economics and Management,University of Science and Technology Beijing;Engineering Research Center of MES Technology for Iron & Steel Production,Ministry of Education;;Stacking Neighborhood Search Algorithm of Billet Stack Shuffling Problem[J];Systems Engineering;2014-11
9 BAI Liang;LI Tie-ke;WANG Bai-lin;DONG Guang-jing;XU Shao-yun;Donlinks School of Economics and Management,University of Science and Technology Beijing;Engineering Research Center of MES Technology for Iron & Steel Production,Ministry of Education;;Optimization Model and Algorithm for Rolling Batch Planning of Hot-rolled Bar[J];Industrial Engineering and Management;2014-06
10 LI Yao-hua~1,WANG Wei~1,HU Guo-fen~2,NING Shu-shi~1 (1.Research Cent.of Info.& Control,Dalian Univ.of Tech.,Dalian 116024,China;2.Shanghai Baosight Software Co.Ltd.,Shanghai 201203,China);Research on slab discharge planning model and algorithm for hot-rolling slab-yard[J];Computer Integrated Manufacturing Systems;2006-03
China Proceedings of conference Full-text Database 3 Hits
1 Shixin Liu~1,Huaming Jin~2 1.College of Information Science and Engineering,Northeastern University,Key Laboratory of Integrated Automation of Process Industry(Northeastern University),Ministry of Education,Shenyang,110004 2.Institute of Mechanical Engineer,Mongolia University of Science and Technology,Baotou,014010;Optimization Model and Algorithm for Goods Delivery under E-Commerce[A];[C];2009
2 Zheng Zhong~1 Xu Wenlin~1 Liu Hongming~2 Chen Xiaoping~3 Jiang Zijin~3 (1.College of Material Science and Engineering,Chongqing University,Chongqing,400045;2.Information Engineering Technology Co.,Ltd.,Panzhihua Iron and Steel(Group) Co.,Panzhihua,617062; 3.Panzhihua Iron and Steel(Group) Co.,Panzhihua,617067);Production Planning Optimization System for Hot-strip Rolling[A];[C];2009
3 Tang Hongbo Liu Jianrong BAOSHAN IRON & STEEL CO.,LTD Tel: 021-26649673Fax: 021-26649671 Postcode:201900 Email: tanghb@baosteel.com;The Comparison Between two Kinds of Planning Management Models of MES in Baosteel[A];CHINA ASSOCIATION FOR QUALITY[C];2005
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Li Sujian(University of Science & Technology Beijing)Cheng Zonghai(Hot Rolling Mill Plant);Slab ABC Classification And Management[J];BAO STEEL TECHNOLOGY;1994-05
2 CUI Jianshuang, LI Tieke, ZHANG Wenxin Management School, University of Science and Technology Beijing, Beijing 100083, China;Hybrid flowshop scheduling model and its genetic algorithm[J];Journal of University of Science and Technology Beijing;2005-05
3 TU Xue-ping1,2,3) ,SHI Can-tao1,2),LI Tie-ke1,2)1) School of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China2) Engineering Research Center of MES Technology for Iron & Steel Production,Ministry of Education of China,Beijing 10083,China3) Project Department,Dongfang Boiler Group Co.Ltd.,Zigong 643000,China;Model and algorithm for the slab location optimization decision problem based on fuzzy matching[J];Journal of University of Science and Technology Beijing;2011-03
4 L Zhenliao,Fan Zhiping,Zhu Fajun,Hu Guofen,Gu Yongxing;Optimal Mathematical Model and Its Application in Rolling Plan[J];JOURNAL OF NORTHEASTERN UNIVERSITY;1998-06
5 Tang Lixin(Northeast University,Shenyang,China);Intelligent Optimization-based Production Planning and Scheduling in Iron and Steel Industry[J];Chinese Journal of Management;2005-03
6 WANG Min,LI Tie-ke(School of Economy and Management,University of Science and Technology,Beijing 100083,China);Improved Partheno-genetic Algorithm for Turned-out Slab Stack Problem[J];Industrial Engineering and Management;2009-04
7 GUO Dong-fen,LI Tie-ke(Sch.of Managemant,Univ.of S&T Beijing,Beijing 100083,China);Constraint-based algorithm for Job Shop scheduling[J];Computer Integrated Manufacturing Systems;2007-01
8 LIU Zhi_xin, LI Jian_guo, XIE Jin_xing, XING Wen_xun (Department of Mathematics, Tsinghua University, Beijing 100084,China);Model and algorithm of solving restricted loading problem[J];Control Theory & Applications;2003-01
9 LIU Shi-xin~(1),ZHOU Shan-chang~(1),SONG Jian-hai~(2),WANG Meng-guang~(1)(1.School of Information Science & Engineering,Northeastern University,Shenyang Liaoning 110004,China;2.MES Business Department,Shanghai Baosight Software Limited Company,Shanghai 201900,China);Prize collecting traveling saleman problem based model and algorithm for hot strip rolling unit planning[J];Control Theory & Applications;2006-01
10 REN Hui-Zhi1 TANG Li-Xin1 1.Liaoning Key Laboratory of Manufacturing System and Logistics,Logistics Institute,Northeastern University,Shenyang 110004;Study on Modelling and Optimization Method for the Slab Stack Shuffling Problem Considering Area Crane Capacity[J];Acta Automatica Sinica;2010-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved