Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Guangdong Power Transmission Technolo》 2003-01
Add to Favorite Get Latest Update

The Compilation of Operation Starting Program for Transmission and Transform-Equipments

(Foshan Power Supply Branch, Guang-Dian Power Grid (Group) Ga,, Ltd, Foshan, FengGang, GuangDong 52800)  
The transmission and transformer equipment are put into operation in accordance with the starting program after the completion of installation and the acceptance of transmission and transformer equipment.to ensure that the equipment can safely and successfully enter into the operation condition.This paper describes the general conent and requirements for the compilation of operation starting program for transmission and transformer equipment as well as the necessity of the conformity of repuirements.lt gives examples to explain the train of thought and suggestions during the compilation of starting program.
【CateGory Index】: TM72
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 3 Hits
1 WANG Xue-min (Guangdong Power Engineering Corp.,Guangzhou 510730,China);Treatment and precautions against common failures of oil-immersed transformers[J];Guangdong Electric Power;2005-02
2 Zhang Jian,Zhang Hua;Analysis and treatment of motor stator coils burn-down in bulb flow-type generator[J];Jiangxi Electric Power;2007-04
3 CHEN Yuan-fei (Guangdong Machinery Research Institute, Guangzhou510635, China);The Breakdown Reason Analysis of Automatical Foam Molding Machines[J];Mechanical & Electrical Engineering Technology;2006-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved