Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Guangdong Power Transmission Technolo》 2003-01
Add to Favorite Get Latest Update

The Engineering is Measured by Synthetical Unit Price Detailed for Invite Tenders

Guangdong dingli engineering and consults Ltd. , Lin Jun (510080)  
The engineering is measured by syntheticals unit price valuate of detailed list for invite tenders is being favour of construction unit and valute personnel operation , for the engineering management provides the convenience.and can fully transfer strengthen the management to the contracto , advance the construction technology ,that is one kind of more practical valuate method of reduction cost , beckon to submit a tender the trend of method development after being.
【CateGory Index】: F284
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved