Parameter Control of Unit Start-up in Super-critical Unit Boiler Without BCP

Di Xiaodong;Cui Haidi;Special Equipment Safety Supervision Inspection of Jiangsu Province Nantong Branch;CASIC Harbin FengHua Limited Company;  
Analysis the reason that causes the high steam temperature at the beginning of the unit start-up in a super-critical unit boiler without BCP in one power plant,Put forward methods of parameter optimization of boiler feed-water flow at the beginning of boiler start-up,boiler working air flow,secondary air damper value,fuel quantity and feed-water temperature and so on,It can effectively solve the problem of high steam temperature at the beginning of the turbine start-up.
【CateGory Index】: TM621
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Zhang Guowei,Hu Hairong,Guo Xiaohong(Harbin Boiler Co.,Ltd,Harbin 150046,China);Heavy Oil Burning Principium and Usage for Export of Boiler[J];锅炉制造;2012-04
2 Huang Bizhong1,Hao Baoqian2(1.Harbin Boiler Co.Ltd.,Harbin 150046,China;2.Datang International Tuoketuo Power Generation Co.Ltd.,Tuoketuo 010206,China);HBC's Design of the 660MW Supercritical High-ash-bituminous fired Boiler With High Elevation[J];锅炉制造;2011-02
3 HUANG Wei,LI Wen-jun,BIN Yi-yuan,et al.;Start-up of 600MW Supercritical Boiler on Opposed Firing without Circulating Pump[J];电站系统工程;2010-03
【Co-citations】
Chinese Journal Full-text Database 5 Hits
1 XU Jiwei;Inner Mongolia Guohua Hulun Buir Power Generation Co.,Ltd.;;RB Function Tests on 600 MW Supercritical Lignite Boiler and Its Problems Analysis[J];内蒙古电力技术;2015-02
2 LI Peng;Huamei Thermal Power Generation Co., Ltd.;;Energy-Saving Analysis for Startup Systems of Supercritical CFB Boiler[J];中国电力;2013-09
3 WANG Xin,WANG Han-qiang,ZHAO Peng(Central Southern China Electric Power Design Institute,Wuhan 430071,China);Design Feature of 600MW Heavy Oil-fired Boiler System[J];锅炉技术;2013-01
4 HUANG Gui-lan (Fujian Yongfu Project Consultants Co.,Ltd., Fuzhou 350001, China);Application of Water Circulation Pump in Supercritical Thermal Power Generating Units[J];能源研究与管理;2012-03
5 WU Yuxin,LI Shijie(Fujian Datang International Ningde Power Co.Ltd.,Ningde 355006,Fujian Province,China);Start-up Program and Analysis of 660 MW Ultra Supercritical Unit Without Boiler Circulating Pump[J];电力建设;2011-01
【Secondary Citations】
Chinese Journal Full-text Database 6 Hits
1 LIU Jian-ge,BO li-qun(Hunan Yiyang Electric Power Generation CO.,Ltd,Yiyang 413000,China);Introduction to starting-up of 600MW boiler without boiler water circulating pump[J];湖南电力;2009-02
2 HUANG Wei, ZHANG Jian-ling, PENG Min, HUANG Lai, GUO Wei-hua, CHENG Gui-bing, HE Jun-min (Hunan Electric Power Test and Research Institute,Changsha410007,China);Prevention measures for too high main steam temperature during the running up of 600 MW supercritical power unit[J];中国电力;2008-08
3 LI Wen-jun~1 HUANG Wei~1 ZHAO Hong-yu~2 XIANG Yong-lin~2 (1.Hunan Electric Power Test and Research Institute,Changsha 410007,China; 2.Hunan Xiangtan Electric Power Generation Co.,Ltd.,Xiangtan 411102,China);The Control Methods of Steam Temperature on Supercritical Boiler's Start-up Process[J];锅炉技术;2008-03
4 YU Fu,WANG Bao-wen,WANG Ji-chengGuodian Shuangyashan Power Generation Co Ltd,Shuangyashan 155136,Helongjiang Province,PRC;CAUSE ANALYSIS AND SOLVING MEASURES FOR LOW COMBUSTION EFFICIENCY OF HEAVY OIL IN ONE 670t/h BOILER[J];热力发电;2007-10
5 HUANG Wei;CAUSE ANALYSIS OF HIGHER MAIN STEAM TEMPERATURE DURING ROTATION-IMPULSING TO START UP 600 MW SUPERCRITICAL UNIT AND ADOPTED MEASURES[J];热力发电;2006-11
6 Yuan Ying, Yao Wei;IMPACT OF HIGHER SEA LEVEL ON PULVERIZED COAL COMBUSTOR[J];热力发电;2000-04