Study on the advantages of metal inspection in the production and supervision of boiler equipment of 1000MW unit

Cheng Jian;Tian Heshun;Guodian Hanchuan Power Generation Co.,Ltd.;  
In view of the quality supervision of the boiler equipment before,there is lag and insufficient quality inspection enforcement in the production process of the equipment,and the equipment supply sequence is not scientific,reasonable,and cannot be effectively connected with the installation site. The paper puts forward a new management mode in which metal supervision and inspection resident manufacturers participate in the production and supervision of equipment,finally,the production quality of boiler equipment was improved and the supply schedule was improved. It provides a reference for the future construction of high quality 1000 MW high efficiency supercritical boiler.
【CateGory Index】: TK229.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 LI Mu;China Power Investment Corporation;;Discussion on the Supervision of Thermal Power Equipment in China Power Investment Corporation[J];中国电业(技术版);2015-04
2 XU Shou-cheng1,WU Fei-wen2,SHI Jia-yan3 (1.China Power Complete Equipment Co.,Ltd.,Beijing 100011,China;2.Xi'an Thermal Power Research Institute Co.,Ltd.,Xi'an 710032,China;3.China Electric Power Research Institute,Beijing 100085,China);Discussion on User Supervision of Electric Equipment Manufacturing in China[J];电力建设;2008-09
3 CHEN Tingkuan(State Key Laboratory of Multiphase Flow in Power Engineering,Xi'an Jiaotong University,Xi'an 710049);Development and Research on Supercritical and Ultra-supercritical Boiler Technology[J];世界科技研究与发展;2005-06
4 ;Practice and Experience of Power Plant Boiler Manufacturing Supervision[J];河北电力技术;2005-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Man;ZHANG Hai;LU Jun-fu;WU Yu-xin;ZHANG Da-long;Education Ministry Key Laboratory on Thermal Science and Power Engineering,Department of Thermal Energy Engineering,Tsinghua University;;Development of the Design of a 600 MW Low Mass Flow Speed Supercritical Pulverized Coal-fired Boiler With a Vertical Tube Coil[J];热能动力工程;2014-03
2 TONG Ying;ZHONG Wei;WU Yanling;LI Zhi;TONG Shuiguang;Zhejiang University;Yantai Longyuan Electric Power Technology Co., Ltd.;;Performance Analysis Platform of Supercritical Power Station Boilers Based on the Fluid Network Method[J];中国电机工程学报;2014-05
3 LIU Chang-liang;ZHANG Yong-bo;State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources,North China Electric Power University;College of Control and Computer Engineering,North China Electric Power University;;Simulation of Combined Control Strategy of Steam Temperature of Double Reheat Unit[J];自动化与仪表;2013-11
4 ZHANG Weiqiang,LI Huixiong,ZHANG Qing,LEI Xianliang,ZHANG Yifan,CHI Haomiao,JIA Minyue(State Key Laboratory of Multiphase Flow in Power Engineering(Xi’an Jiaotong University),Xi’an 710049,Shaanxi Province,China);Experimental Study on Flow Resistance of Supercritical Pressure Water in an Internally Ribbed Tube[J];中国电机工程学报;2013-17
5 Zhang Liwen, Zhao linjie;Yunnan-Guangdong HVDC Transmission Project Converter Station Main Equipment Supervision[J];设备监理;2013-03
6 XU Jiong , ZHOU Yigong ( Shanghai Electric Power Generation Group , Shanghai 201199 , China );Overview of the Development of 700℃ USC Technique[J];上海电气技术;2012-02
7 Xu Jiong,Zhou Yigong(Shanghai Electric Power Generation Group,Shanghai 201199);The Development of 700℃ USC Technology[J];中外能源;2012-06
8 LIU Chao(Shanxi Yinhe Hongbo Power Engineering Consulting Ltd.,Xi'an 710054,Shanxi,China);Coal-fired Power Energy-saving Measure[J];能源与节能;2012-04
9 YAN Su-xing1,CAI Wen-he2,WANG Xiao-ying1,WANG Gan-gang3,LIANG Jun4,WANG Bao-chen4(1.Shaanxi Electric Power Research Institute,Xi'an 710054,China;2.North China Electric Power Research Institute Co.,Ltd.,Beijing 100045,China;3.Suzhou Nuclear Power Research Institute,Suzhou 215004,China;4.CSEC Guohua(Beijing) Electric Power Research Institute, Beijing 100069,China);Quality control and management of welding engineering in ultra supercritical/supercritical unit[J];中国电力;2012-01
10 XU Hong-bing1,YUAN Shi-tong2,DING Man2(1.Power Engineering Department,North China Baoding Electric Power VOC.& TECH.College,Baoding 071051,China; 2.Automation Department,North China Electric Power University,Baoding 071003,China);Modeling for the combustion system of 1000MW ultra supercritical boiler[J];中国电力;2011-12
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 CHENG Guibing,LI Ming,XU Shu,JIANG Beihua(Hunan Electric Power Corporation Research Institute,Changsha 410007,China);Economy and Timeliness Analysis of Applying New Type Steam Seal[J];电力建设;2011-10
2 Tang Yunlin (China Power Engineering Consulting (Groups) Corporation, Beijing, 100011) [;New Milestone for Thermal Power Construction in China——Rising of Ultra-super cirical (USC) Coal-fired Units[J];电力建设;2004-10
3 LI Jun;WU Shao-hua;LI Zhen-zhong School of Energy Science and Engineering, Harbin Institute of Technology, Harhin 150001, China; National Power Plant Combustion Engineering Technology Research Center, Shenyang 110034, China;Ultra-supercritical pressure coal-fired power generation technology is the preferential choice for China to develop clean coal power generation technology at present[J];中国电力;2004-09
4 WANG Xi-fan;Devote Major to Developing Supercritical Pressure Generating Units ,Optimize Thermal Power Mix[J];中国电力;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved