Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Guangzhou Architecture》 2015-04
Add to Favorite Get Latest Update

Research on Engineering Management and Technical Innovation of Guangzhou's Metro Construction

ZHANG Zhi-liang;Guangzhou Metro Group Co.,Ltd.;  
The paper mainly presents the management and technology innovation on the construction of Guangzhou metro. It is universally acknowledge that Guangzhou has complicated geological conditions,which is known as the" geological museum". How to deal with the complicated geological environment,therefore,becomes a big challenge to Guangzhou metro constructer. Facing such an obstacle,Guangzhou metro constructors spared no effort to overcome it,including making the deep research on the shield method,pipe jacking method,mining method,cut and cover method,cap and excavation method,immersed tunneling method,elevated rail transit,foundation treatment,building protection,construction monitoring and risk management,putting the normalization,standardization,refinement,informatization management of project construction into practice comprehensively,striving to explore the characteristic of Guangzhou metro construction.
【CateGory Index】: U231.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved