Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《CHINESE JOURNAL OF NUCLEAR SCIENCE AND ENGINEERING》 1995-04
Add to Favorite Get Latest Update

DYNAMIC SIMULATING CALCULATION FOR STEAM GENERATOR IN NUCLEAR POWER PLANT

OIU SUIZHENG;GUOYUJUN;ZHANG JINLING;SU GUANGHUI;YU ZHENWAN;JIA DOUNAN(Xi'an Jiaotong University)  
A mathematical calculation model used to appropriately analyse and dynamically simulate theU-tube recirculation type steam generator is proposed in this paper.With the Gear' s method, asafety analysing program is developed, which simulates perfectly the transient behavior whensteam generator operates in regular condition or accident case. By this program,the authors studyand analyse the responses of transient parameters to some different disturbances, and when thefeed water in steam generator is lost,the calculated results are in good agreement with those cal-culated by RELAP5 program.
【CateGory Index】: TL353.13
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Xiong Yangheng(Wuhan University of Hydraulic and Electric Engineering, 430072);Several Problems in the Research and Design to the Steam Generator of the Nuclear Power Plant[J];NUCLEAR POWER ENGINEERING;1994-04
【Co-citations】
Chinese Journal Full-text Database 2 Hits
1 CAI Jing, YU Shun-zhou, GU Guo-biao(Institute of Electrical Engineering CAS, Beijing 100080,China);Study and Application on the Gas-liquid Two-phase Flowin Micro-rectangular Pipe[J];Large Electric Machine and Hydraulic Turbine;2005-01
2 ZHOU Xianyu (Central-South Institute of Technology, Hengyang, Hunan);Theory Structure on “Decontamination Technology for Primary Coolant Loop of In-Service Pressurized Water Reactors”[J];China Nuclear Science and Technology Report;1996-00
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved