Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

Selection of Objective Dam for Turbine Runner of Baize Hydropower Plant

Tang Xinfa(Guangxi Design Institute of Water Conservancy and Electric Power)  
Objective data for turbine runner is selected according to the feature of Baise hydropower plant and method ofselection for turbine hydraulic date, after summing, analyzing and demonstrating the documents about urnner of largeFrancis turbine of nation and abroad.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved