Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2006-04
Add to Favorite Get Latest Update

Modification and Operation Management of Nandan Material Transfer Station for Longtan Hydropower Project

LIU Jian-cheng~1,XIONG Xiong~2,MA Wang-hua~1(1.China National Water Resources & Electric Power Materials & Equipment Co.,Ltd,Beijing,100045;2.Longtan Hydropower Development Co.,Ltd,Nanning,530023)  
As China's second-largest oversize project after Sanxia Project,Longtan Hydropower Project boasts a great consumption of such materials as cement,fly ash,steel products,and admixture,most of which are delivered to Nandan material transfer station by railway and forwarded to the construction site by car.The safe and high-efficient service of Nandan material transfer station plays an important role to ensure material supply for the construction of Longtan Hydropower Project.Nandan material transfer station has a relatively small unloading capacity at preliminary stage,but it is able to satisfy the need of major materials for Longtan Hydropower Project after modification and promotion,which ensures the smooth progress of construction and serves as a reference for the construction and operation of similar projects in the future.
【CateGory Index】: TV512
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved