Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2009-01
Add to Favorite Get Latest Update

Template Planning and Application for Cao River Aqueduct Project in Mid Route of South-to-North Water Transfer Project

HU Hong-jun(Chinese Water Conservation Water and Electricity Fourth Construction Bureau,Xining 810006)  
The aqueduct of the Cao River is one of the important components of the emergency water supply project on Beijing-Shijiazhuang section in mid route of the South-to-North Water Transfer Project,and is the largest canal aqueduct that has been built in China.In order to ensure the appearance quality of concrete and construction period,principles of template design and planning are discussed in view of the complex structure of the Cao River Aqueduct Project and its rush construction period.Structure of the template at each part of the aqueduct and construction situation are introduced in detail.It concludes that standardization and mechanization of template is able to greatly improve the level of construction engineering.
【CateGory Index】: TV672.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved