Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2009-01
Add to Favorite Get Latest Update

Analysis on Special Facilities Investment Control for Reservoir Inundation Treatment of Hydropower Station

PAN Xiu-ting(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)  
Reservoir inundation treatment is important in the construction of a hydropower station,of which the planning of special facilities is one of the important components.Special facilities account for a considerable proportion of investment in the construction of some hydropower projects,and concern various industries and administrative departments that have different standards and specifications for planning and design.Factors that may affect special facilities from design to implementation are studied and measures for control are proposed.
【CateGory Index】: F426.91
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved