Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2009-04
Add to Favorite Get Latest Update

Engineering Design and Operation Management of Aggregate Processing System at Jinjitan Hydro Project

HUANG Feng-xiang(Guangxi Juneng Hydropower Development Co.,Ltd,Nanning 530022)  
The aggregate processing system is one of the most important temporary works of Jinjitan Hydro Project.The system,arranged to be as simple and practical as possible by taking advantage of topographic conditions,helps achieve reduction of construction and production costs,convenient and feasible management,and eligible product.The construction of the system is discussed in the paper,providing reference for similar projects.
【CateGory Index】: TV53
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved