Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2009-04
Add to Favorite Get Latest Update

Type Selection and Arrangement of 110kV HV Distribution Device for Shanxiu Hydropower Station in the Zuojiang River of Guangxi

ZHOU Rui-xiang,LIU Ai-mei(Nanning Institute of Water Conservancy and Hydro-Power Design,Nanning 530001)  
The topography of where Shanxiu Hydropower Station is located is narrow,bringing about difficulty for the arrangement of 110kV HV distribution device.SF6 GIS distribution device with full-enclosed composite arrangement of apparatus is selected after technological and economic comparison.It demands less area and helps save investment on civil works and equipment so that the GIS platform is arranged compactly,safely and reliably with good looking to satisfy customers.
【CateGory Index】: TV734
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved