Design of Land Requisition and Resettlement Program for Nam Tha 1# Hydropower Station in Laos

QIN Yuan-yi(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)  
There is a population of 9,299 that need to be resettled due to the construction of Nam Tha 1# Hydropower Project with an installed capacity of 168MW in Laos.The resettlement planning becomes the key factor that determines whether the project can proceed smoothly or not,because it is very difficult to relocate so many people.The introduction of resettlement program design for the station is to provide some references and lessons for other similar hydropower projects in Laos or any other Asian countries.
【CateGory Index】: F426.91;F426.61;D73
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved