Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2009-05
Add to Favorite Get Latest Update

Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station

CHU Yue-ting,WANG Peng-yu(Longtan Hydropower Development Co.,Ltd,Tian'e 547300)  
From May 2007 to December 2008,seven 70MW hydrogenerator units of Longtan Hydropower Station were put into operation one after another.During transition period from construction to operation,a number of measures were taken to ensure safe and steady operation of units at the early stage of their operation in spite of the lack of experience in large units operation and the short time of production preparation.In this paper,the experience is summed up for reference of hydropower construction and production.
【CateGory Index】: TV752
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-references】
Chinese Journal Full-text Database 3 Hits
1 ZHAI Ruo-yu (China Datang Group Corporation, Beijing 100032);Position and role of Longtan Hydropower Project in the Great Western Development Strategy[J];Water Power;2003-10
2 DAI Bo (Longtan Hydropower Development Co. Ltd., Nanning Guangxi 530023);Establishing the models of construction and management with Longtan Project characteristics[J];Water Power;2003-10
3 Chu Yueting (Longtan Hydropower Development Co., Ltd., Nanning Guangxi 530023);Constructing International First-class Hydropower Plant with the Characteristics of Longtan management[J];Water Power;2007-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved