Test Study on Flow Conditions at Water Intake of Power Station at Shihutang Navigation-power Junction

ZHOU Jia-yu1,YIN Chong-qing1,WANG Zhao-bing1,WU Men-wu2(1.Chongqing Southwestern Hydraulic Engineering Research Institute for Waterway,Chongqing 400016; 2.Scientific Research Institute of Pearl River Water Resources Commission,Guangzhou 510611)  
Through hydraulic model test,the paper studies water and sediment movement at some part of water intake of power station at Shihutang Navigation-power Junction built on the Ganjiang River in order to ensure that the power station has sufficient water to generate electricity under normal pool level or water release with the gate fully opened.The arrangement of the water intake is optimized on the basis of its original layout.The test shows that the proposed model of the optimized layout enables the power station to generate electricity to the greatest extent.Such layout provides favorable water conditions at the water intake where diversion works smoothly without sediment deposition so that the intake can work safely and reliably.
【CateGory Index】: TV131.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved