Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2009-06
Add to Favorite Get Latest Update

Application of Control System to Portal Crane on Dam Crest of Power House on Inner River of Changzhou Hydraulic Complex

TANG Xi-chun(Guangxi Changzhou Hydropower Development Co.,Ltd,Wuzhou 543002)  
The control system involving PLC + touch screen + field bus + frequency converter is applied to the portal crane on dam crest of the power house on the inner river of Changzhou Hydraulic Complex,which makes the operation and maintenance of equipment much easier.
【CateGory Index】: TV736
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIAN Zhiwei(Guangdong Yuedian Penglatan Power Generation Co.Ltd.,Dabu 514200,China);Reformation of Spillway Gate Monitoring & Control System at Penglatan Hydropower Plant[J];Hydropower Automation and Dam Monitoring;2009-01
2 Lu Changyi (Guangzhou Metro Design & Research Institute, Guangzhou 510010);The Design of Metro Flood Gate[J];Urban Rapin Rail Transit;2005-04
3 ZHANG Jin-bin1,2 (1.Engineering College of China Geological University,Wuhan,Hubei 430000,China;2.Guizhou Investigation and Design Institute of Water Conservancy and Hydropower,Guiyang,Guizhou 550002,China);Application of Rolling Bearings in Improvement of Spillway Gate of Liangkan Hydropower Station[J];Journal of Water Resources and Architectural Engineering;2008-01
4 Yan Zhiquan Guangzhou Metro Corporation,510380,Guangzhou,China;Research & Application of Metro Flood Gate System[J];Urban Mass Transit;2007-10
5 Yang Yi-kai(The branch of Guangxi Guigang shipping hub,Guigang Guangxi 537102,China);Analysis of wear and tear in filling idler wheel valve components in Guigang hub[J];Mechanical Research & Application;2009-05
6 TANG Xi-chun(Guangxi Changzhou Hydropower Development Co.,Ltd,Wuzhou 543002);Study on Operation,Maintenance and Management of Metal Structures and Equipment of Hydropower Plants[J];Hongshui River;2009-06
7 TAN Zong-qi;Analysis of the hydraulic synchronous lifting system for two lifting-point hydraulic hoist[J];Hoisting and Conveying Machinery;2009-12
8 CHEN Hai-wen (Baise Chengbihe Reservoir Administration Bureau,Baise Guangxi 533021);The Testing and Calculation on Hoist Weight of Spillway Sluice in Chenbihe Reservoir[J];Enterprise Science and Technology & Development;2008-24
9 GENG Ling-sheng,GONG Xiang-feng,WANG Guang-hui,HAO Xiao-hui(Shandong Provincial Hydraulic Research Institute,Jinan,Shandong 250013,China);Design of Lie-down Steel Floodgate with Extended Arm Based on ANSYS[J];Journal of Water Resources and Water Engineering;2010-02
10 GUI Yue-wu(Shanghai Municipal Engineering Design General Institute,Hefei 230061,China);Design of Control System for Heavy Steel Dam Gates[J];Modern Electronics Technique;2010-13
China Proceedings of conference Full-text Database 2 Hits
1 Qiu Liqing Cao Pingzhou Bai Runbo (Civil Engineering College of Hohai University, Nanjing 210098, Jiangsu , China);Analysis of Shear Lag Influence in Contract Region between Wheel and Track of Large-scale Hydraulic Track[A];[C];2008
2 LIAN Zhiwei (Guangdong Yuedian Penglatan Power Generation Co Ltd,Dabu 514200,China);REFORMATION OF SPILLWAY GATE MONITORING & CONTROL SYSTEM AT PENGLATAN HYDROPOWER PLANT[A];[C];2009
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved