Technical Exploration on Lingqu Water Conservancy Project
DIAO Shu-guang;Guangxi Electric Power Industry Investigation Design and Research Institute;
The shipping function of Lingqu canal and its corresponding structures have been abandoned, which couldn't be easily observed from the appearance of the existing landscape. The paper makes a brief introduction to the composition of the original structures,the layout of the hydro-complex,as well as the material selection and construction method of some special parts,which provides an evidence for further exploration of Lingqu water conservancy project.
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.