Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Hongshui River》 2014-01
Add to Favorite Get Latest Update

Discussion on Shift Management Mode for Pingban Hydropower Station

WU Ying-wei;Guangxi Pingban Hydropwer Development Co., Ltd.;Electrical Engineering College of Guangxi University;  
The paper analyzes the current situation,guarantee measures and future prospects of operation shift mode of Pingban hydropower station through the descriptions of the reformation on operation shift mode,which can be well referenced by similar hydropower enterprises.
【CateGory Index】: TV737
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 CHEN Qiwei,WANG Changsheng (Sichuan Huaneng Kangding Hydropower Development Company limited Chengdu 610041);‘City hydropower’construction and management model based on information technology and its application on Huaneng Lengzhuguan hydropower plant[J];Journal of Hydroelectric Engineering;2004-04
【Co-citations】
Chinese Journal Full-text Database 4 Hits
1 SONG Xufeng,FENG Yiping,XIANG Jie , FANG Jiong,QIN Jun,BIAN Shaoshuai,YANG Lijun (Tianhuangping Pumped Storage Power Plant, Anji 313300, China) (East China Electric Power Test & Research Institute, Shanghai 200437, China);Plant-level Real Time Information System of Tianhuangping Pumped Storage Power Plant[J];Hydropower Automation and Dam Monitoring;2006-03
2 YUAN Lili,BAI Jianfei(China Institute of Water Resource and Hydropower Research,Beijing 100038,China);Supervision and Control System for the Floodgates of Yantan Hydropower Plant[J];Hydropower Automation and Dam Monitoring;2007-04
3 TIAN Li1,ZHANG Yihua2,ZHANG Yaqi1,TANG Weigui1(1.Three Gorges Cascade Dispatching & Communication Center,Yichang 443133,China;2.Gezhouba Hydropower Plant,Yichang 443002,China);Operation and Management Mode of Centralized Monitoring(Decentralized Management) of Gezhouba Hydropower Plant[J];Hydropower Automation and Dam Monitoring;2008-04
4 Tian Li1, Zhang Yihua2,Zhang Yaqi1,Tang Weigui1 (1.Three Gorges Cascade Dispatching & Communication Center, Yichang Hubei 443133; 2.Gezhouba Hydropower Plant, Yichang Hubei 443002);Implementation of New Efficient Operation Management Mode in the Gezhouba Hydropower Plant[J];Water Power;2009-06
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 Tang Tao(Nanjing Sino German Protection & Substation Control System Ltd. Co. Nanjing 210003, China);DEVELOPMENT AND PROSPECTS FOR THE AUTOMATION TECHNOLOGY OF POWER PLANTS AND SUBSTATIONS[J];Automation of Electric Power Systems;2004-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved