Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Heilongjiang Hydraulic Science and Technology》 2018-02
Add to Favorite Get Latest Update

Study on Pumping Equipment Performance Optimization for Cascade Pumping Station

HU Ke-mei;Soil and Water Conservation Station of Longjiang County Water Affairs Bureau;  
Beijing Miyun Reservoir is a large-scale reservoir used to match the disproportion between the southern water transferred from the north and regional water use,starting from the Tuancheng Lake,passing by the pumping station in grade nine,to fill the pressure,then to transfer water to the Miyun Reservoir. There are many hydraulic structures along the project,and the process of water conveyance is complex on the project site. Being faced with the water transferring tasks with different demands,requiring the cascade pumping station group to operate efficiently under different project situations,therefore,it is important especially to conduct the optimal analysis for operation of the pumping station system. Through establishing the hydraulics simulation model,this study analyzed the pumping station optimization,putting forward the high-efficiency operation scheme,and the researched results will supply guiding and technical supporting for the optimization of cascade pumping stations.
【CateGory Index】: TV675
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved