Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Heilongjiang Hydraulic Science and Technology》 2018-02
Add to Favorite Get Latest Update

Introduction to Jacking Pipe Construction with Soil and Water Balance Method

YANG Xiao-fei;Shanxi Provincial Dongshan Water Supply Project Construction Management Bureau;  
Taking the water transmission pipe project of water supply project in a province as the example,this paper analyzed the jacking pipe construction technology with soil and water balance method,described the main process,construction theory and construction technique and the technical points about construction process, including sunk shaft construction method and the method to determine reasonably the jacking force,and put forwards the reasonable suggestion,providing references for relative projects.
【CateGory Index】: TU991.05
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved