Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Jilin Electric Power》 2015-01
Add to Favorite Get Latest Update

Selection and the Status Quo Analysis of Wind Collecting Circuit in Desert Geology

Takeing a wind farm project in Inner Mongolia as an example,this article compared wind collecting circuit number,conductor cross-section,tower type and coundation type,analysed the present situation and existing problems of wind farm collecting circuit in desert geology.A method combined tower with reinforced concrete pole was proposed.In this method,tower should be used in main node,flexible reinforced concrete foundation should be mainly adopted,sand fixing scheme should be selected combined with engineering environment.This method can not only control the cost but also ensure the long-term stability and safety of tower foundation.
【CateGory Index】: TM614
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved