Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Chlor-Alkali》 2011-01
Add to Favorite Get Latest Update

UPS program development and implementation of turbine

QU Xiang-yi,ZHANG Shu-qin(Shandong Haike Shengli Electric industry Co.,Ltd.,Dongying 257091,China)  
For safety and stability of turbine operation,power UPS devices were added to use for turbine vice pumps and instrument cabinet at voltage fluctuations and short-term power failure,played a good protection to ensure the stability of production.
【CateGory Index】: TQ114.26
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved