Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Jilin Science & Technology of Communications》 2004-01
Add to Favorite Get Latest Update

Temperature Control Technique in the Bulk Concrete Construction of Base Slab of Main Pier in the Maokengxi Extra - long Span Bridge

Based on base slab of No. 1 and No. 2 main pier of the Maokengxi extra - long span bridge, the paper introduces the temperature controlled and construction techniques in the bulk concrete base slab construction, also proposes the temperature controlled and construction techniques in the bulk concrete construction.
【CateGory Index】: U445.57
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved