Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Metal Mine》 2002-01
Add to Favorite Get Latest Update

Preliminary Discussion on the Reform of the Deepening of the Main Shaft System at Wushan Copper Mine and Its Effect

Guo Xiangdong(Nanchang Nonferrous Metallurgical Designing Research Institute)  
In accordance with the requirements of new mining and mineral processing technologies in the main shaft deepening at Wushan Copper Mine and on the basis of the former project,the skip hoisting system was reformed and in pit crushing added.In view of the very sticky ore of this mine and the problems left by the former project,special measures were taken in the specific design and implementation process to ensure a clear and safe system while paying attention to the investment saving.Meanwhile,new consideration was made on the existing problems.
【CateGory Index】: TD262
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved