Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2005-01
Add to Favorite Get Latest Update

The application of vibro-replacement stone column in soft soil foundation treatment

FANG Ming-jie (The 4th Engineering Co. Ltd. of The Third Engineering Bureau of Chin a Railway, Beijing 102300, China)  
Combined with practice and based upon analysis o f field geological conditions the construction plan of vibro-replacement stone column is determined. In this paper its construction technology and quality cont rol measures are introduced, which effectively improved the bearing capacity of foundation and acquired good effects in practice.
【CateGory Index】: TU471.8
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 ZHAO Yong-hong;The application and analysis of vibro-replacement stone column in foundation reinforcement[J];Shanxi Architecture;2007-05
2 HUANG Hua-wei;The management technique of macadam pile soft soil basement by using vibrof lotation method[J];Shanxi Architecture;2007-07
3 ZHUANG Chun-lan ZHANG Hui-zhi;The application of vibro-replacement stone column in hydraulic architecture soft foundation management[J];Shanxi Architecture;2008-05
【Citations】
Chinese Journal Full-text Database 1 Hits
1 YAO Yu lin (Hongyuan Construction Engineering Co. Ltd. of Datong Coal Mine Group, Datong 037036, China);Technology applying vibro-replacement stone column to reinforce soft soil foundation[J];Shanxi Architecture;2003-03
【Co-citations】
Chinese Journal Full-text Database 1 Hits
1 ZHANG Ben-ye~1,ZHANG Yan~2(1.Xuzhou Institute of Technology,Xuzhou,221008,China;2.Xuzhou Civil Engineering Quality Supervision Station,Xuzhou,221006,China);Practical Examples of Vibro-replacement Stone Piles in Foundation Stabilization[J];Xuzhou Institute of Technology;2006-06
【Co-references】
Chinese Journal Full-text Database 9 Hits
1 Qu Qingyu (Yichang Gezhouba Management & Construction Division, Yichang, Hubei, 443002, China);Application of Vibrating-jetting Technology to Compact Sand-fill in Cofferdam (Ⅱ-phase) of TGP[J];Hubei Watero Power;2003-02
2 Yin Baobin Li XiulingJiangsu Geologic Foundation Pile Engineering Company,Zhenjiang,212111;Construction Process and Application of Dry Vibration Wash Boring Method[J];JIANGSU GEOLOGY;1997-01
3 TANG Jian-zhong,WANG Ye-yi (China Academy of Building Research,Beijing 100013,China )$$$$;Vibro Replacement Stone Column Composite Foundation for Liquefaction of Sand in Beijing Area[J];Building Science;2004-03
4 ZHAO Li-qiang (Datong City No.3 Construction & Installation Project Company, Datong 037006, China);Application & analysis of vibratile broken-stone pile in stabilizing foundation[J];Shanxi Architecture;2005-02
5 BAI Hui-ren HU Li-xiong WANG Chang-min;The quality control on vibro-replacement stone column construction[J];Shanxi Architecture;2005-06
6 HUANG Bao-long,LIU Ye,LI Bo(Shenyang Agricultural University,Shenyang,Liaoning 110161,China);Study on Treatment Effect of Vibro-Replacement Stone Piles in Practical Project[J];Construction Technology;2005-S1
7 秦绪臣,刘鲁坡,吕振波;The elliptic-parabolic yield surfaces model and its softness matrix[J];WATER RESOURCES SCIENCE AND TECHNOLOGY OF SHANDONG;1996-04
8 WANG Xiao-hui,LI Xiang-yang,YANG Lu-ming, WANG Min-xia(Coal indusery xi'an design & research institute shaan xi xi'an 710054);Design and detection on the crushed stone vibratory pile[J];;2002-03
9 Liu Yahong;Application and Analysis of a Reinforce Foundation by Crushed Stones Flaps to Wash[J];Shanxi Coking Coal Science & Technology;2005-04
【Secondary References】
Chinese Journal Full-text Database 9 Hits
1 LIU Hong-bin;Vibration dense rock pile construction and the supervision points[J];Shanxi Architecture;2008-07
2 YE Cai-juan;The application of gravel pile in soft foundation treatment[J];Shanxi Architecture;2008-09
3 LI Mao-chun;Mechanism research of the railway foundation reinforcement of the vibro-replacement stone column in the swamping wetland[J];Shanxi Architecture;2008-21
4 LI Yan-guo;On the construction scheme of the large area of soft ground in high-fill sections[J];Shanxi Architecture;2008-25
5 JIANG Fei;Application of the vibro-replacement gravel pile in the foundation in the seismic liquefaction area[J];Shanxi Architecture;2008-33
6 LEI Shu-heng;On vibro replacement stone column method[J];Shanxi Architecture;2009-14
7 LI Peng-yuan ZHAO Yong-jiu;The application of the vibro replacement stone column in the foundation treatment of soft soil retaining walls[J];Shanxi Architecture;2009-14
8 LU Yuan-hui;Comparison of vibrofloatation method and immersed stone pile method in foundation treatment[J];Shanxi Architecture;2009-24
9 ZHAO Jie-yong 1,WEI Yong-xing 2 (1.China Railway Tunnel Group Co.,Ltd.,Luoyang,Henan 471009;2.China Railway Eryuan Engineering Group Co.Ltd.,Chengdu,Sichuan 610031,China);Research on the Construction Technology of Crushed Stone Pile for Soft Soil Railway Foundation in Clustered Depression At Yanrongfeng[J];Journal of Railway Engineering Society;2009-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved