The study of pullout testing of prestressed cables in a rock slope

SHI Qing-hua SONG Xian-ling  
Through the pullout testing of 16 mlong and 600 kNprestressed cables at the beginning of a high and dangerous slope stabilizationworks,detailed analyses are carried out to the pullout testing process of prestressed cables and the relevant design parameters are also verifiedand adjusted.After the adjustification,18 mlong prestressed cables are adoptedin the design.
【CateGory Index】: TU43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 ZHOU Ya-bin;High slope anchorage engineering construction[J];Shanxi Architecture;2007-31
2 XIANG An-tian1,ZHU He-hua2,LI Bi-xiong1 (1.School of Architecture and Environment,Sichuan Univ.,Chengdu 610065,China;2.Dept.of Geotechnical Eng.,Tongji Univ.,Shanghai 200092,China);A Dynamic Feedback Design Method of Anchorage Cable Based on On-site Pullout Test[J];Journal of Sichuan University(Engineering Science Edition);2010-03
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZENG Bo1,ZENG Lang2(1.Guangdong Technical College of Water Resources and Electric Engineering,Guangzhou510635,China;2.Shanghai Jingsheng Construction Supervision Company,Shanghai200540,China);Application of the bracing technique with composite soil nail in project[J];Building Science Research of Sichuan;2003-02
2 LIU Zhen-qing~1,XUE Xiao-xia~2,HE Ya-bo~1 (1.School of Civil Engineering,Wuhan University,Wuhan,430072,China; 2.China Railway 18th Group 2nd Co.,Ltd.,Tangshan063000,China);Light dewatering used in the foundation of the bridge construction[J];Building Science Research of Sichuan;2004-02
3 ZHUANG Xin-shan~(1,2),ZHU Rui-geng~1,ZHAO Xi~2(1.Wuhan University of Technology,Wuhan 430070,China;2.Hubei University of Technology,Wuhan 430068,China);Study on the limit analytic method determinate soil layer anchor supporting capacity[J];Building Science Research of Sichuan;2005-04
4 LIU Jie,SUN Zhiliang,FU Baoliang(College of Civil Engineering,Tianjin University,Tianjin 300072,China);Analysis on the stability of cement-soil deep mixing pile gravity retaining wall[J];Sichuan Building Science;2006-05
5 ZHANG Li1,XU Zhaoyang1,2(1.College of Architectural Science & Engineering,Yangzhou University,Yangzhou 225009,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Security analysis & design method of soil nailing and bolting support[J];Sichuan Building Science;2009-05
6 TANG Zhengguang 1,XU Zemin1,YANG Chunzhen2,ZHAO Huimin1(1.Kunming University of Science and Technology,Kunming 650224,China;2.Yunnan 198 Geology Team Prospect for Coalfield,Kunming 650000,China);The contrast analyse for distortion destroy and reinforce process of one slope[J];Sichuan Building Science;2010-03
7 FANG Cong-yan(Wuhu Vocational Institute of Technology,Wuhu 241000,China);Analysis of the uplift Mechanism of bolt-grouting body based on finite difference[J];Journal of Anhui University of Technology and Science(Natural Science);2007-03
8 Li Dahua(Dept. of Civil Engineering,Anhui Institute of Architecture,Hefei,230022)Yang Lei(Anhui Provincial Institute of Architectural Design & Research,Hefei,230001);THE DESIGN AND CONSTRUCTION OF FOUNDATION WITH EARTH ANCHOR[J];Journal of Anhui Institute of Architecture;2002-02
9 YIN Zong-xue(Anhui Province Highway Administration Board,Hefei 230022,China);Hui-hang highway anchor rod construction quality detection[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2009-05
10 LU Dong,LI Fan(School of Civil Engineering,Hefei Unirersity of Technology,Hefei 230009,China);The finite element analysis of pile-anchor protection in deep foundation pit[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2010-06
China Proceedings of conference Full-text Database 10 Hits
1 YUAN Bo,WU Guo-hua,ZHOU Fu-rong (1.11th Geological Team of Zhejiang Province,Zhejiang Wenzhou 325006,China; 2.Zhejiang Huakun Geological Development Company Limteb,Zhejiang Wenzhou 325006,China);Construction Technology of the Pressure—dispersing Anchor Rope in the Slope Engineering[A];[C];2011
2 WEI Li-de,CHEN Cong-xin (Institute of Rock and Soil Mechanics,The Chinese Academy of Sciences,Wuhan 430071,China);Developing the numerical simulating methods of the 3-D bolt[A];[C];2007
3 HU Hao-jun~(1-3),WANG Yuan-han~(1,2) (1.School of Civil Engineering and Mechanics,Huazhong University of Science & Technology,Wuhan 430074,China; 2.Hubei Key Laboratory of Control Structure,Huazhong University of Science & Technology,Wuhan 430074,China; 3.Survey and Design Institute,Beijing Military Region Air Force,Beijing 100022,China);Simulation and analysis of foundation excavation and support[A];[C];2007
4 HUANG Hui~①YAN Changgen~②(①Guangzhou Subway Company,Guangzhou 510030)(②School of highway Engineering Chang'an University,Xi'an 710054);TREATMENT THE LEAKAGE OF THE DEEP EXCAVATION ENGINEERING[A];[C];2002
5 WANG Wei-liang,REN Xiao-song (Research Institute of Structural Engineering and Disaster Reduction,Tongji University,Shanghai 200092);COMPREHENSIVE COMPARISON AMONG EXCAVATION SUPPORTING SCHEMES OF LARGE-SCALE LABORATORY FOUNDATION PIT[A];[C];2010
6 Gongxisheng Liujingliang Zhoujianfeng Sisiyu China Jingye Engineering Co.Ltd.Beijing 100088 Central Research Institute of Building and Construction,MCC Group Beijing 100088;Application of retard-bonded prestressed technique in floor slab[A];[C];2008
7 ZHU Hui (No.3 Engineering Co., Ltd of China Railway Shisiju Group, Yanzhou 272100,China);Construction Quality Control of Long-heavy Prestressing Bundled Reinforcement[A];[C];2005
8 Peng Mingxiang,Zheng Jicheng,Li Jun,Zhou Jiwen,Zhao Jiping (China State Construction Engineering Co.,Ltd.,Beijing 100037,China);Construction Technology of Deep and Large Trench Cutting and Re-mixing Deep Wall in Sino-steel Plaza[A];[C];2011
9 Fan Yunzhong~1,Xu Ming~2,Yang Liguo~3,Chen Zhiqiang~4 (1.Agriculture Committee of Zhenjiang,Zhenjiang,Jiangsu 212009,China; 2.Water Conservancy Project Management Office of Hongze Lake in Jiangsu,Hongze,Jiangsu 223100,China; 3.Geotechnical Research Institute of Hohai University,Nanjing,Jiangsu 210098,China; 4.Jiaxing Century Transportation Design Co.,Ltd.in Zhejing,Jiaxing,Zhejiang 314001,China);Bank Slope Support for Sheet Pile to Upgrade Navigation Channel[A];[C];2011
10 Yang Jibao,Hu Deming (Shanghai Zhiping Foundation Engineering Co.,Ltd.,Shanghai 200060,China);The Existing Problems and Countermeasures in Design and Construction of Some Building Foundation[A];[C];2011
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Wenjie et al.;Study on Mechanism of Consolidation of Loose Media by Prestressed Anchor[J];Underground Space;2002-01
2 FAN Yu-jie~1,WAN Sheng-wu~2(1.College of Architecture and Civil Engineering,Huazhong University of Science and Technology,Wuhan 430074,P.R..China;2.College of Urban Construction,Wuhan University of Science and Technology,Wuhan 430070,P.R..China);Calculation Method of Effective Length of Bolt Support and Ultimate Pullout Force of Prestressed Cable[J];Chinese Journal of Underground Space and Engineering;2006-04
3 QU Jian-jun+{1,2}, WANG Jia-cheng+1, CHENG Guo-dong+1, LI Fang+2, ZU Rui-ping+2 (1. State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS, Lanzhou Gansu 730000, China; 2. Laboratory of Blown Sand Physics and Engineering, CAREERI, CAS, Lanzhou Gan;An Experimental Study on the Mechanisms of Freeze-thaw and Wind Erosion of Ancient Adobe Construction in Northwest China[J];Journal of Glaciolgy and Geocryology;2002-01
4 GAO Yongtao, WU Shunchuan, SHUN Jinhai Civil and Enviromental Engineering School, UST Beijing, Beijing 100083, China;Application of the Pre-stress Bolt Stress Distributing Principle[J];Journal of University of Science and Technology Beijing;2002-04
5 DING Xiu mei, HUANG Run qiu, ZANG Ya jun (College of Environment and Civil Engineering, Chengdu University of Technology, China);THREE DIMENSION SIMULATION WITH FLAC~( 3D) ON THE SUBSIDARY STRESS INDUCED BY FRAME BEAM WITH PRESTRESS CABLE[J];Journal of Chengdu University of Technology(Science & Technology Edition);2003-04
6 LI Duan you, TANG Ping, LI Yi ming (Yangtze River Scientific Research Institute, Wuhan 430010,China);Safety monitoring of rock anchor prestress during 1st stage construction of TGP's permanent lock[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;2000-01
7 ZHANG Bao jun\+1,ZHANG Man\+1,JIN Bao zhang\+2 (1.Yangtze River Scientific Research Institute,Wuhan 430010,China; 2.Northern Henan Exploration Design Institute,Anyang 450000,China);Monitoring on prestressed anchors applied to reinforce Geheyan Power Station's slope[J];Journal of Yangtze River Scientific Research Institute;2001-03
8 LI Gang~1, XU Wei jun~1, HUANG Xiang~1, LI Duan you~1, FENG Jian jiang~2 (1.Yangtze River Scientific Research Institute,Wuhan430010,China; 2.The Yangtze River Pre stressed Co.Ltd of Hubei,Yichang443100,China);Study of pre stressed anchorage cable of ship lift in Three Gorges Project[J];Journal of Yangtze River Scientific Research Institute;2004-04
9 GAO Da-shui (Changjiang Exploration Planning Design Research Institute, Wuhan 430010,China);Application of Prestressed Anchorage Technology in Rock-Earth Engineerings and statistics of Their Technology Parameters[J];Journal of Yangtze River Scientific Research Institute;2004-06
10 Fu Jing, Sheng Qian (Yangtze River Scientific Research Institute, Wuhan 430010);Numerical Modeling of High Slope Reinforced With Pretensioned Tendons[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;1996-03
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 DAI Peng-fei1,2,CHEN Wen-wu1,2(1.Key Laboratory of Western Disaster and Environmental Mechanics,Ministry of Education,Lanzhou Gansu 730000,China;2.College of Civil Engineering and Mechanics,Lanzhou University,Lanzhou Gansu 730000,China);Soil Engineering Properties of Ming Dynasty Great Wall Ruins in Huangzhong County,Qinghai Province[J];Journal of Glaciology and Geocryology;2011-04
2 WU Ya-bin YAO Meng TAO Ying;Anchoring technology in the slope reinforcement[J];Shanxi Architecture;2008-21
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved