Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2006-01
Add to Favorite Get Latest Update

Prevention and treatment of line blockage in underwater concrete construction by direct pipe method

WEI Pei-guang  
In view of the line blockage accident usually encountered in underwater concrete construction by direct pipe method,according to three pouring stages and various blocking situations corresponding treatment and prevention methods are introduced in order to reduce loss to minimum.
【CateGory Index】: TU755.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved