Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2006-01
Add to Favorite Get Latest Update

Construction method on bamboo mucus large module pouring clean water concrete for shear wall

LI Xue-jun QIN Mei  
Combined with engineering of Lihuayuan plot,it illustrates design of follow board from selection of panel and keel、consolidation method of large module and support of follow board,and introduces construction method on bamboo mucus large module pouring clean water concrete for shear wall,its effect is good.
【CateGory Index】: TU755.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 HU Jun;Construction of cold plat supporting pile dry concrete in power plant enlarging project[J];Shanxi Architecture;2007-23
【Co-references】
Chinese Journal Full-text Database 1 Hits
1 CHEN Da-chun;Fair-faced concrete and thin plastering construction[J];Shanxi Architecture;2006-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved