Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2006-04
Add to Favorite Get Latest Update

Matters need attention in construction of mud-jacking for pouring pile

ZHANG Xu-feng  
It analyzes mechanism on increasing bearing capacity of pouring pile after mud-jacking, combined with specific engineering it introduces control measures from pressurized-water experiment、injected amount and injected time, and points out it should establish technical measures according to practical condition to reach expected effect.
【CateGory Index】: TU753.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 3 Hits
1 LI Hui-ning;The construction technology of rotary excavating core cast-in-place pile and the quality control[J];Shanxi Architecture;2008-11
2 LIN Jin-qiang;Drills the hole pile foundation to make up imposes the solid processing method[J];Shanxi Architecture;2009-12
3 ZHOU Feng WANG Fang;Construction technology and quality control of cast-in-place bored pile with slurry protecting wall[J];Shanxi Architecture;2010-05
【Co-references】
Chinese Journal Full-text Database 5 Hits
1 LIU Jian-ping CHEN Wei;The quality control of drill driven cast-in-place pile in construction[J];Shanxi Architecture;2006-19
2 WANG Xin-jian;Quality controlling of the construction for drilling-holes pouring piles[J];Shanxi Architecture;2008-11
3 XIAO Zhong;On the construction technology of the borehole poring piles and its quality control study[J];Shanxi Architecture;2008-35
4 DIAO Feng-ping;Abnormal phenomenon in cast-in-situ bored pile construction and preventive measures on it[J];Shanxi Architecture;2009-06
5 DU Wen-ju (College of Sichuan Architectural Technology Traffic department,Deyang 618000,China);Simply Analyzing of Common Problem and Measure of Prevention and Cure Being about Drilled Pouring Pole under Construction[J];Science and Technology of West China;2008-08
【Secondary References】
Chinese Journal Full-text Database 2 Hits
1 ZHAO Gao-liang;Bored pile hole-marking technology research in sandy pebble soil[J];Shanxi Architecture;2009-09
2 LIU Wen-long;Construction technology and quality control of churning driven cast-in-place bored pile[J];Shanxi Architecture;2009-28
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved