Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2013-01
Add to Favorite Get Latest Update

On construction technique for fastener steel pipe derrick of brick chimney

LI Bin-yu1 LI Jian-wen2 SANG Yu-bo2(1.Taiyuan Dongshan Coal Mine Co.,Ltd,Taiyuan 030013,China; 2.China Coal Building and Installation No.7 Engineering Co.,Ltd,Taiyuan 030052,China)  
According to the construction difficulties for the high structure projects of the brick chimney of boiler's,the paper introduces the construction technique for the fastener steel pipe derrick,illustrates its construction procedure,the operation points,and the mechanic equipment,indicates the quality control,the safety measures and the environmental-friendly measures,and points out the craft can be easily operated and practical with better benefits,so it can be further extended.
【CateGory Index】: TU755.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved