Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2013-01
Add to Favorite Get Latest Update

Engineering budget problems and countermeasures

WANG Yong CHANG Yue-ping(Shanxi Academy of Urban-Rural Planning & Design,Taiyuan 030001,China)  
The paper analyzed the information asymmetry and hysteresis phenomenon of engineering budget determining method occurring in engineering budget process,explores how to improving engineering budget quality,and puts forward and illustrate scientific suggestions,which has positive meaning for controlling engineering cost.
【CateGory Index】: TU723.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 LU Fuchun, CHEN Jun;Problems Existing in Engineering Budget Management and Relevant Countermeasures[J];Construction Economy;2007-03
2 LIU Qiu-zhi(Shandong Harbor Construction Co.,Ltd.,Rizhao 276826,China);Problems of Attention in Compiling Engineering Budget Cost[J];Port & Waterway Engineering;2006-03
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 HUANG Ling(Wuhu Water Affairs Bureau,Wuhu 241000,China);Failure analysis of water conservancy projects budget cost management[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2008-04
2 ZHANG Hong(Finance Department,Jiangsu Institution of Education,Nanjing 210013,China);On Financial Management and Supervision of Capital Construction of Colleges[J];Journal of Changzhou Vocational College of Information Technology;2009-01
3 Zhang Beixian;The Existent problems and Their Countermeasure Analysis Of Cost Management For Expressway House Construction Project[J];Fujian Construction Science & Technology;2009-04
4 LU Fuchun, CHEN Jun;Problems Existing in Engineering Budget Management and Relevant Countermeasures[J];Construction Economy;2007-03
5 ZHENG Wen-hao;Study on China's Export Enterprises' Current Operation Situation and Opportunity in Post Subprime Crisis Era[J];Sci-Tech Information Development & Economy;2011-29
6 CHANG Dan(Building and Installation Engineering Co.,Ltd.of China Railway 12th Bureau Group,Taiyuan 030024,China);On analysis of issues in engineering bill of quantities in current building projects[J];Shanxi Architecture;2013-01
7 CHEN Xian-bin (Department of Construct,Huizhou University,Huizhou 516015,Guangdong,China);Construction unit project budget management countermeasure discussion[J];Journal of Shaoguan University;2008-09
8 HUANG Ling;Failure Analysis of Water Conservancy Projects Budget Cost Management[J];Journal of Wuhu Vocational Institute of Technology;2008-03
China Proceedings of conference Full-text Database 1 Hits
1 ;Budget Constraint, Government Intervention, and Project Cost Empirical Evidence from China’s State-owned Large Construction Enterprises[A];[C];2012
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 ZHOU Ying,ZHOU Ya(1.Financial Affairs Office of Zhongnan Hospital,Wuhan University,Wuhan 430077,China;2.Financial affairs Department,Hubei Postal School,Wuhan 430079,China);The strategic budget management:a creative thinking about the all-round way budget management system[J];Journal of Hubei Normal University;2005-06
2 DU Shuai 1,YU Qing-feng 2,ZHOU Chang-shun 3;Strengthen engineering budget management of construction unit is the effective way to control engineering cost[J];Communicatios Science and Technology Heilongjiang;2002-10
3 CHEN Hai tao (The Third Engineering Co. Ltd. of The 12th Engineering Group of China Railway, Taiyuan 030024, China);Application of construction budget in project construction[J];Shanxi Architecture;2003-04
4 Zhang Yan-dong,Li Wei-hua,Gao Si-si(Jilin Teacher's Institute of Engineering and Technology,Changchun 130052, China);On Strategy-oriented Total Budget[J];Taxation and Economy;2007-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved