Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2013-01
Add to Favorite Get Latest Update

On difficulties in management and according methods for current road construction

ZHANG Zhi-cheng (Taiyuan Municipal Public Facilities Administrative Office,Taiyuan 030002,China)  
According to the difficulties of the program management in current urban road drainage,the paper analyzes the features,the aims and tasks of the program management,and the current environment of the urban road drainage project,and points out some methods to solve some difficulties for the current program management,so as to realize the management aims of the programs.
【CateGory Index】: U415.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Yuan-hao(Anhui Institute of Architecture & Industry,Hefei 230601,China);The practice of and thought on the investment control of the construction unit's engineering project[J];Sichuan Building Science;2006-02
2 Chen Huali (Anhui Nanfeng Jiahe Properties Development Co,Ltd,Chaohu 238000,China);Effective Control of Building Cost in Management of Building Project[J];Anhui Architecture;2007-04
3 Wang Dafan (Wuhu Daxin Industrial Group Co. Ltd, Wuhu 241000, China);On Cost Management of Real Estate Development Project[J];Anhui Architecture;2008-04
4 Chen Lin (Wuhan Wujian Mechanized Construction Co.,Ltd,Wuhan 430000,China);Site Attestation Signing during Building Construction[J];Anhui Architecture;2009-05
5 ZUO Zheng(Zongyang County Water Conservancy Construction Installment Project Co.Ltd,Zongyang 246702,China);The application of dynamic controlling method to the construction costs control[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2010-04
6 CAO Ping1,2,DING Shi-zhao1(1.School of Economics & Management,Tongji University,Shanghai 200092 P.R.China;2.School of Architecture & Civil Engineering,Xi'an Science & Technology University,Xi'an 710054 P.R.China);Implementation Planning of Subway Construction Project[J];Chinese Journal of Underground Space and Engineering;2008-01
7 Huang Zhihuang1,Wang Lijuan2,Zhang Dong3,Li Tianbin4(1.Sichuan Expressway Construction Development Corpration,Chengdu 610041,China; 2.Sichuan Academy of Safety Science and Technology,Chengdu 610059,China; 3.Shaanxi Provincial Highway Survey and Design Institute,Xi'an 710068,China; 4.State Key Laboratory of Geohazard Prevention & Geoenvironment Protection of Chengdu University of Technology,Chengdu 610059,China);Rapid Construction Management of Long Distance and Large Slope Inclined Shaft in Soft Rock[J];Chinese Journal of Underground Space and Engineering;2012-S1
8 DUAN Chuan-hong (Forestry Research Institute of Xinyang City,Xinyang,Henan 464031);Economic Research of the Urban Lanscape Constrution[J];Northern Horticulture;2011-03
9 PANG Hai-qing1,YU Cui-lan2(1.Second Project Dept.of No.1 Co.of Second Metallurgical Construction Co.Ltd of China.,Baotou 014010,Nei Monggol,China;2.Metallurgical Residue Co.of Baotou Steel(Group) Corp.,Baotou 014010,Nei Monggol,China);How to Enhance Management of Cost and Valuation of Work for Construction Project in Construction Enterprises[J];Science & Technology of Baotou Steel(Group) Corporation;2009-05
10 ZHANG Guang-rui(Construction Co.of Northwest Pioneer Co.Ltd.of Baotou Steel(Group)Corp., Baotou 014010,Nei Monggol,China);Cost Management in Construction Project Management[J];Science & Technology of Baotou Steel;2012-02
China Proceedings of conference Full-text Database 8 Hits
1 LU Ronggen (Jianxi Thermal Power Contruction Corporation,Nanchang 330001,Jiangxi Province,China);Role of Construction Team Building and Managemrnt in Project Cost Control[A];[C];2011
2 LI Zhengqiang (Sichuan Zhongcheng Coal Group Limited Co.Chengdu,610072);An Approach to a Three-level Management Model[A];[C];2010
3 LI Li (No.2 Company of China Railway Shisiju Group, Taian 271000,China);Control of Cost Deviation in Project Construction[A];[C];2005
4 Zhang Huixia,Zhou Zhefeng,Lu Yaping,Tian Haiyang;The Technique of Informatization Management in Cross-River Tunnel Combination with Bridge Project[A];[C];2009
5 ;钢结构工程焊接质量管理[A];[C];2011
6 ;钢结构工程焊接质量管理及其在昂船州大桥钢箱梁工程中的应用[A];[C];2011
7 Liu Changsheng (Shandong Bureau of Coal Geological Exploration,Taian,Shandong 271000);Execution of Safety Technical Measures in Pile Foundation Engineering Construction[A];[C];2007
8 WANG Xi-hua (Shengli Oilfield Petroleum and Chemical Construction Corporation,Dongying Shandong 257000,China );Risk Management and Prevention of Offshore Oil Engineering[A];[C];2008
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved