Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2013-10
Add to Favorite Get Latest Update

The prestressed box girder construction of Fen-Xing high-speed AS10 contract section

YAN Ling(Taiyuan Municipal Engineering Corporation,Taiyuan 030002,China)  
Combining with engineering example,this paper introduced the construction scheme of this contract section prestressed concrete box girder from reinforced framework forming,concrete pouring and curing,prestressed tension and grouting and other aspects,discussed the hoisting method of bridging machine,ensured the construction quality and construction period requirements of this engineering.
【CateGory Index】: U445.57
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHANG Xiao wen (Shanxi Professional College of Transportation, Taiyuan 030006, China);Design of highway bridge and construction new technology[J];Shanxi Agchitecture;2002-05
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 SU Xueping,LI Deqin(Road & Bridge Engineering Co.,Ltd.,of South China,Zhongshan 528400,China);Comparison and selection of arch rib assembly schemes of Dongping Bridge in Foshan[J];Sichuan Building Science;2011-06
2 PENG Zeng-gang(Countryside Highway Administration Bureau of Mingguang,Mingguang 239400,China);Discussing on banish disengage of bridge prefabricate plate[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2006-06
3 ZHANG Yun-tao(1.Civil Engineering School of Anhui Institute of Architecture & Industry,Hefei 230022,China;2.Civil Engineering School of Southeast University,Nanjing 21096,China);The cause and prevention of deformation of prestressed T-shaped beam[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2007-02
4 GUO Dong-hai,HU Cheng(School of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Discussion on some problems of construction control of continuous box girder[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2007-02
5 LIU San-qi1,HU Cheng2,JIANG Tian-xiao3(School Of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Experiment research on prestress tube frictional resistance of PC beam bridge[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2010-02
6 Li Hongliang (Anhui Luohe-Fuyang Railway Co., Ltd, Fuyang 236000, China);Fabrication of the 30m Post-tensioned T-shaped Girder[J];Anhui Architecture;2008-04
7 Peng Shenkai(Anhui Provincial Road & Bridge Engineering Company,Hefei 230001,China);Construction Process of Occlusive Pile in "Smooth Yihuan Road Traffic Project"[J];Anhui Architecture;2008-05
8 Guan Bin(Anhui Highway Engineering Supervision Co.,Ltd.,Hefei 230031,China);Brief Introduction to the Turning-over Formwork of Bridge's Hollow Pier[J];Anhui Architecture;2008-05
9 Zhou Zhili (Nanjing Xigangguo Pasture,Nanjing 210033,China);Application of Vaccum-auxiliary Grouting Technique to Expressway Bridge[J];Anhui Architecture;2009-02
10 Huang Zhifu (Anhui Provincial Communications Investment Group Co., Ltd,Hefei 230011,China);On the Economic Benefit of the Application of Machine-made Sand to Expressway[J];Anhui Architecture;2009-02
China Proceedings of conference Full-text Database 9 Hits
1 Su Shurong (Xinyang construction of the nuclrae industry,Xinyang Henan,464000);Highway subgrade construction technology[A];[C];2011
2 Xingling Jian (Xiamen Traffic Quality Supervision Station 361000);The application in crossing-sea bridge high-performance concrete of polycarboxylates high performance water-reducing admixture[A];[C];2008
3 ;预应力桥梁裂缝的成因之一——预应力施工中存在的若干技术问题[A];[C];2007
4 FU Ling, DONG Bo, QIAO Meng-qiang (Shandong Road & Bridge Group Corporation Jinan 250021,China);DS1200 Maurer Expansion Joint Work Method of Main Spans of Binzhou Yellow River Bridge on No.205 Natkmal Highway[A];[C];2005
5 CHEN Jun~(1,2) GUO Mink~3 (1 Guizhou University,Guiyang 550003,China;2 State Professional Lab of Geological Hazard Prevention and Engineering Geological Environment Protection,Chengdu,China;3 Guizhou Institute of Communication Science,Guiyang,550003 China));PILOT STUDY ON THE RELATIONSHIP BETWEEN ROAD-CONSTRUCTION MATERIALS PROPERTIES AND ITS SEDIMENTARY ENVIRONMENT IN KARST AREA,GUIZHOU PROVINCE,CHINA[A];[C];2005
6 JIN Zhi-zhan (Zhejiang Tiangong Metal Strucutre Company Ltd, Jinhua 321022, China);Construction method for concrete-filled steel tube arch bridge without closure join segments[A];[C];2003
7 ZHU Hong-bing~(1,2) YU Zhi-wu~2 HUANG Chuan-sheng~(2,3) 1.School of Civil Engineering,Wuhan University of Science and Technology,Wuhan 430070 ,China; 2.School of Civil Engineering and Architecture of Central South University,Changsha 410075,China; 3.Jiangxi Zhongchang Construction Works Consulting and Supervision Co.,Ltd.,Nanchang 330009,China;Rib span construction of large span concrete-filled steel tube arched bridge[A];[C];2007
8 HUANG Chuan-sheng~(1,2) HAO Liang-qiu~3 1.School of Civil Engineering and Architecture of Central South University,Changsha 410075,China; 2.Jiangxi Zhongchang Construction Works Consulting and Supervision Co.,Ltd.,Nanchang 330009,China; 3.Bridge Engineering Division,the Ist Engineering Group Co.,Ltd.of China Railways,Weinan 714000,China;The construction supervision discussion of large span concrete-filled steel tube arched bridge[A];[C];2007
9 Gao Bo,Han Yuhui (Shanghai Evolation Building Shift Engineering Co.,Ltd.,Shanghai 200336,China);Key Construction Technologies for Rebuilding Bottom-structure with Remaining Existing Top-structure of Some Bridge[A];[C];2011
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 Mao Changshi Du Guohua Fan Lichu(Tongji University,Shanghai);An Inverse Analysis with Creep Effect for Concrete Cable-stayed Bridge[J];CHINA JOURNAL OF HIGHWAY AND TRANSPORT;1995-S1
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved