|
1 |
WANG Wei-feng~1,BI Jun-li~2 (1.Beijing Urban Engineering Design and Research Institute,Beijing 100037,China; 2.China Railway Tunnel Survey and Design Institute,Luoyang 471009,China);Construction project optimizing of soft rock and shallow buried tunnel[A];[C];2007 |
2 |
SONG Yu-xiang~(1,2),JIA Xiao-yun~2,ZHU Yong-quan~2 (1.Southwest Jiaotong University,Chengdu 610031,China;2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Research on simplified method of multiple structure reliability of metro tunnel[A];[C];2007 |
3 |
WANG Shao-qiang~1,QIAO Chun-sheng~2,XU Gan-cheng~3,ZHU Zheng-guo~2 (1.Anhui Provincial Communications Investment Group Co.Ltd.,Hefei 230011,China; 2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China; 3.Air Force Engineering Design and Research Bureau,Beijing 100077,China);Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions[A];[C];2007 |
4 |
TANG Jin-song~(1,2),LIU Song-yu~1,TONG Li-yuan~1,YU Jun~1 (1.College of Transportation,Southeast University,Nanjing 210096,China; 2.School of Civil Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China);Comparative study on tunneling scheme of shallow overburden and large-span highway tunnel in cracked rock mass[A];[C];2007 |
5 |
DU Ju-hong,HUANG Hong-wei (Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Three-dimensional numerical simulation of construction for bias closely spaced tunnels with altitude difference[A];[C];2007 |
6 |
CHEN Jian-gong,ZHANG Yong-xing (Department of Civil Engineering,Chongqing University,Chongqing 400045,China);Numerical analysis of low strain dynamic response of anchorage bolt system[A];[C];2007 |
7 |
YING Song1 , CAI Wang1, MAO Sui1, LI Cangsong2 ( 1. Corporation of GUIZHOU HIGHWEI, Guiyang 550001, China; 2. China Railway Southwest Research Institute Co.,Ltd., Chengdu 610031, China);Point Analysis of the Monitoring Technique in Tunnel Constructing of Shuipan Highway[A];[C];2009 |
8 |
SU Xiaofeng (The First Railway Survey and Design Institute Co. LTD. of China, Xi’an 710043, China);Discussion on Design of Neighborhood Tunnels[A];[C];2009 |
9 |
ZHAO Huixiong1, YU Yu1,YANG Jianmin1 (China Railway Eryuan Engineering Group CO.LTD,Chengdu 610031, China);Experimental Study on Rational Supporting Parameters in High Speed Railway Loess Tunnel[A];[C];2009 |
10 |
WANG Shaofei1,2,3,YU Wengsheng4,CHEN Jianzhong1,2,3 (1.Department of Tunnel Engineering,Chongqing Communications Research & Design Institute,Chongqing 400067,China;2.Key Laboratory Technology of Tunnel Construction and Maintenance of Ministry of Communications,Chongqing 400067,China;3.National Engineering & Research Center for Highways in Mountain Area,Chongqing 400067,China;4.Headquarter of Wuji Expressway Engineering Project,Transportation Department of Jiangxi Province,Nanchang 330029,Jiangxi,China);Disscuion on Standards for Fire Safety of Highway Tunnel[A];[C];2009 |
|