Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Shanxi Architecture》 2013-23
Add to Favorite Get Latest Update

On application of chemical grouting in getting out trouble at some geological sections along TBM Daban Tunnel

LUO Zhi-xin ( Yili Rivers Development and Construction Administrative Bureau of Xinjiang,Urumqi 830000,China)  
The paper mainly introduces the adoption of the chemical grouting method can succeed in getting out of trouble of the treatment of the jamming at some geological sections in the TBM construction of Daban Tunnel in Xinjiang,and the performance and features of the chemical grouting materials and craft technique,and illustrates the chemical grouting materials can adhere to the demands of TBM construction with more excellent material performance and higher adaptability,compared with traditional cement,the sodium silicate grouting craft and materials in the treatment of getting out of trouble.
【CateGory Index】: U455.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 4 Hits
1 WANG Jiang(China Railway First Survey and Design Institute Group Co.,Ltd.,Xi'an 710043,China);Analysis on Jamming of Double-shield TBM in Construction of Water Diversion Tunnel and Jamming Releasing Technology[J];Tunnel Construction;2011-03
2 DENG Qingli(China Railway Tunnel Stock Co.,Ltd.,Zhengzhou 450000,China);Technology for TBM Tunneling Through Joint-densely-developed Granite Sections[J];Tunnel Construction;2011-06
3 ZHAO Yi(China Railway Tunnel Stock Co.,Ltd.,Zhengzhou 450001,Henan,China);Technology for Releasing Jammed Small-diameter Telescopic TBM by Means of Advance Chemical Grouting[J];Tunnel Construction;2013-01
4 LI Kun1,2,SHE Chengxue1(1.State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University, Wuhan 430072,China;2.Changjiang Water Resources Commission,Wuhan 430010,China);Numerical test study of peak shear strength of cement-grouted joint under compression shearing[J];Engineering Journal of Wuhan University;2012-05
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 TIAN Yong-ming;On Measures to Overcome Difficult Encountered in Weak Stratum during Construction Stage of Tunnel Built by Double-shield Tunnel Boring Machine[J];Shanxi Hydrotechnics;2009-03
2 SHANG Yanjun,YANG Zhifa,ZENG Qingli,SUN Yuanchun,SHI Yongyue,YUAN Guangxiang(Key Laboratory of Engineering Geomechanics,Institute of Geology and Geophysics,Chinese Academy of Sciences,Beijing 100029,China);RETROSPECTIVE ANALYSIS OF TBM ACCIDENTS FROM ITS POOR FLEXIBILITY TO COMPLICATED GEOLOGICAL CONDITIONS[J];Chinese Journal of Rock Mechanics and Engineering;2007-12
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved